My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2016-081
>
Meetings
>
2016
>
06. June
>
2016-06-21 10:00 AM - Commissioners' Agenda
>
Res-2016-081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2018 11:46:10 AM
Creation date
6/13/2018 11:42:56 AM
Metadata
Fields
Template:
Meeting
Date
6/21/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
l
Item
Request to Approve a Resolution to Amend the 2014 Grant Application for Westside and Huntzinger Roads HSIP Project and Authorize the Signature of the County Road Engineer on the Amended Grant Application
Order
12
Placement
Consent Agenda
Row ID
30235
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Estimated milestones from the project schedule <br />Please provide the estimated month and year for each item below . The milestones need to be determined assuming that the <br />project will be built by contract, not by local agency or a partner agency's forces . If milestones vary for different <br />countermeasures in your project, please identify separate milestones/dates (and identify which countermeasures fit each set of <br />dates) for different countermeasures as needed. <br />Prolect schedule below for Priority #1 through Prlorltv #4: <br />• Project added to local agen cy TIP : 10/14 (completed for Priority #2) <br />• Project added to regional TIP: 11/14 (completed for Priority #2) <br />• Project added to STIP: 1/15 (completed for Priority #2) <br />• Project definition (begin PE): 1/15 (completed for Priority #2) <br />• National Environmental Policy Act (NEPA) kickoff: 3/15 <br />• Environmental documents approved: 12/15 <br />• Right of Way start: N/A <br />• Right of Way complete: N/A <br />• Geometric/30% Design complete: 3/15 (completed for Priority #2) <br />• General Plan/60% Design complete: 6115 (complete for Priority #2) <br />• Advertisement: 1/16 <br />• Contract Awarded: 3/16 <br />• Open to traffic (operationally complete): 6/16 <br />Project schedule below for Priorit~ #5 (PE on l ~): <br />• Project added to local agency TIP : 10/14 <br />• Project added to regional TIP: 11/14 <br />• Project added to STIP: 1115 <br />• Project definition (begin PE): 1/15 <br />• National Environmental Policy Act (NEPA) kickoff: N/A <br />• Environmental documents approved: N/A <br />• Right of Way start: N/A <br />• Right of Way complete: N/A <br />• Geometric/30% Design complete: 9115 <br />• General Plan/60% Design complete: 12115 <br />• Advertisement: N/A <br />• Contract Awarded: N/A <br />• Open to traffic (operationally complete): N/A <br />Comments, if any: <br />Page 5 of 5
The URL can be used to link to this page
Your browser does not support the video tag.