Laserfiche WebLink
Estimated milestones from the project schedule <br />Please provide the estimated month and year for each item below . The milestones need to be determined assuming that the <br />project will be built by contract, not by local agency or a partner agency's forces . If milestones vary for different <br />countermeasures in your project, please identify separate milestones/dates (and identify which countermeasures fit each set of <br />dates) for different countermeasures as needed. <br />Prolect schedule below for Priority #1 through Prlorltv #4: <br />• Project added to local agen cy TIP : 10/14 (completed for Priority #2) <br />• Project added to regional TIP: 11/14 (completed for Priority #2) <br />• Project added to STIP: 1/15 (completed for Priority #2) <br />• Project definition (begin PE): 1/15 (completed for Priority #2) <br />• National Environmental Policy Act (NEPA) kickoff: 3/15 <br />• Environmental documents approved: 12/15 <br />• Right of Way start: N/A <br />• Right of Way complete: N/A <br />• Geometric/30% Design complete: 3/15 (completed for Priority #2) <br />• General Plan/60% Design complete: 6115 (complete for Priority #2) <br />• Advertisement: 1/16 <br />• Contract Awarded: 3/16 <br />• Open to traffic (operationally complete): 6/16 <br />Project schedule below for Priorit~ #5 (PE on l ~): <br />• Project added to local agency TIP : 10/14 <br />• Project added to regional TIP: 11/14 <br />• Project added to STIP: 1115 <br />• Project definition (begin PE): 1/15 <br />• National Environmental Policy Act (NEPA) kickoff: N/A <br />• Environmental documents approved: N/A <br />• Right of Way start: N/A <br />• Right of Way complete: N/A <br />• Geometric/30% Design complete: 9115 <br />• General Plan/60% Design complete: 12115 <br />• Advertisement: N/A <br />• Contract Awarded: N/A <br />• Open to traffic (operationally complete): N/A <br />Comments, if any: <br />Page 5 of 5