My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2016-081
>
Meetings
>
2016
>
06. June
>
2016-06-21 10:00 AM - Commissioners' Agenda
>
Res-2016-081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2018 11:46:10 AM
Creation date
6/13/2018 11:42:56 AM
Metadata
Fields
Template:
Meeting
Date
6/21/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
l
Item
Request to Approve a Resolution to Amend the 2014 Grant Application for Westside and Huntzinger Roads HSIP Project and Authorize the Signature of the County Road Engineer on the Amended Grant Application
Order
12
Placement
Consent Agenda
Row ID
30235
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Priority"4 Thorp Prairie Road 1152770 MP 0.00 to MP 3.51 <br />EXISTING CABU'GUARDRAIL UVGAAllEAT Ml' 11 <br />LENGTH E. W. <br />MP MP IN FT Termln.' Termln.1 RECOMMENDATIONS <br />THORP PRAIRIE ROAD NORTH SIDE 0.741 0.711 80 1 1 We.t Side: extend 40' West, <br />THORP PRAIRIE ROAD SOUTH SIDE 0.741 0.711 108 1 1 West Side: Continue new GR <br />COST ESTIMATE 10 REPLACE EXACT LOCATIONS OF CJlBLf <br />UNIT UNIT COST QTY TOTAL <br />REMOVE CABLE GUARDRAil IF $ 5 .00 188 $ 940.00 <br />REMOVE CABLE GUARDRAllANCHOR EA $ 325.00 4 $ 1,300.00 <br />BEAM GUARDRAIL TYPE 31 NON·FLARED <br />TERMINAL EA S 3,000.00 4 $ 12,000.00 <br />BEAM GUARDRAIL TYPE 318 It POST Lf $ 28.00 5SB $ 15,624.00 <br />FilL & CULVERTS LS EST $ 5,000.00 <br />TRAFFIC CONTROL LS EST $ 2,000.00 <br />MOBILIZATION LS EST S 2,000.00 <br />rESe LS EST $ 1,000.00 <br />RESTORATION & PLANTING LS EST $ 1,000.00 <br />SUB-TOTAL $ 40,864.00 <br />Contingency at 10 % I EST S 4,086.40 <br />Design .t 10% J EST $ 4,086.40 <br />eM.t 10% I EST S 4.086.40 <br />lOTAl E$TIM4TE $ 5),123.20 <br />SAFOv IMPROVEMENTS FOR THE RtMAINOUl Of1m ROAD ... <br />LENGTH E. W. <br />MP MP IN FT Torm'",1 Terminal Radius T.ansltlon RECOMMENDATIONS <br />Soulh 0.6 200 1 1 <br />South 0.9 275 1 1 <br />North 1.5 200 CY fill In lieu of GR <br />/IIorth 1.7 100 1 1 <br />South 1.7 175 1 1 <br />North 2 100 CV fill in lieu 01 GR <br />/liE Co.ner of Mdge 2 15 1 1 <br />SE Corner 0' Bridge 2 15 1 1 <br />5W Corner of Bridge 2 10 1 1 <br />NW Corner of Bridge 2 150 1 1 <br />Move 2 Power Poles Out or Oear Zone No Cost -PUD or P5E to <br />E.st of Horlick Int. North side of Road 2 Relociite per franchise <br />North, From Pit to East side of Driveway 3.7 100 CY Fill in lieu 01 GR <br />North, Wen of Driveway 3.7 975 1 1 <br />South Side lone driveway In middle of <br />proposed GR Run, hence 2 Radius Term) 3.8 1475 1 1 2 <br />North extend from existing GR to R.dlu$ <br />Term 4.6 40 1 <br />North 5 30 1 <br />Move Pole in aea. 20ne North Side of No eo,t-PUD or PSE to <br />Road (Pole Is Guy Support Br.ce for OHP) S.S Relocate per Franchise <br />North & South Sid •• 5.6 200 CY Fill in lieu 01 GR <br />Relocate & Replace Mailbox at 8710.3 <br />Type 3 5.4 <br />Relocate & Replace Mailbox .t 9121 xl <br />Type 1 5.6 <br />Shoulder Fill 6.1 50 CY Fill in lieu of GR <br />North 6_2 500 1 1 <br />South 6.2 300 1 1 2 <br />North 6.6 875 1 1 <br />North 7 80 1 1 <br />UNIT UNIT COST QTY TOTAL <br />BEAM GUARDRAIL TYPE 31 NON·FLARED <br />TERMINAL EA S 3.000.00 19 S 57,000.00 <br />BEAM GUARDRAIL TYPE 318 It POST LF $ 28.00 5215 S 146,020.00 <br />Guardrail Type 31 Tr.ns~ion EA $ 3,750.00 4 S 15,000.00 <br />Select Borrow Incl Haul TN $ 10.00 1300 $ 13,000.00 <br />Ernbankmtnt Compaction CV S 8.00 650 S 5,200.00 <br />TRAFFIC CONTROL LS EST $ 12,000.00 <br />MOBILIZATION LS EST $ 24,822.00 <br />TESC l5 EST 5 3,500.00 <br />RESTORATION & PLANTING l5 EST S 2,000.00 <br />SUB-TOTAL S 278,542.00 <br />Contingency at 10 % j EST S 27,854,20 <br />Oe<ign.t 10% l EST $ 27,854.20 <br />CM at 10% J EST S 27.854.20 <br />1T00Al ffiTMII;fE -$ 361.104.60 <br />COMBINEO TOTAL 415,221 .80
The URL can be used to link to this page
Your browser does not support the video tag.