Laserfiche WebLink
Priority #3 <br />Huntzinger Road MP 2.7-5.07 <br />ITEM QUANTITY UNIT COST UNIT TOTAL COST <br />Corner Chevrons 10 $ 200.00 EA $ 2,000.00 <br />Limited Sight Distance Sign 2 $ 215.00 EA $ 430.00 <br />Flexible Guide Posts 108 $ 40.00 fA $ 4,320.00 <br />Guardrail Type 31 9450 $ 28.00 LF $ 264,600.00 <br />Guardrail Type 31 Transition 4 $ 3,750.00 EA $ 15,000.00 <br />Type 31 Non-Flared Terminal 14 $ 3,000.00 EA S 42,000.00 <br />Traffic Control 1 EST $ 16,500.00 <br />TESC 1 EST $ 1,000.00 <br />Mobilization 1 EST $ 20,000.00 <br />SUB-TOTAL $ 365,850.00 <br />Contingency at 10 % 1 EST $ 36,566.00 <br />DeSign at 10% 1 EST $ 36,585 .00 <br />CM at 10% 1 EST $ 36,585 .00 <br />ITOTAl ESTIMATE $ 475,586.00 I <br />Huntzinger Road MP 5.07-6.99 <br />ITEM QUANTITY UNIT COST UNIT TOTAL COST <br />Corner Chevrons 24 $ 200.00 EA $ 4,800.00 <br />Corner Ahead Sign 2 $ 215.00 EA $ 430.00 <br />Curves Ahead Sign 6 $ 215.00 EA $ 1,290.00 <br />Flexible Guide Posts 62 $ 40.00 EA $ 2,480.00 <br />Guardrail Type 31 1635 $ 28.00 LF $ 45,780.00 <br />Type 31 Non-Flared Terminal 8 $ 3,000.00 EA $ 24,000.00 <br />Traffic Control EST $ 4,000.00 <br />TESC EST $ 500.00 <br />Mobilization EST $ 4,000.00 <br />SUB-TOTAL $ 87,280.00 <br />Contingency at 10 % EST $ 36,566.00 <br />Design at 10% EST $ 8,728.00 <br />CM at 10% EST $ 8,728.00 <br />ITOTAL ESTIMATE $ 141,302.00 I <br />COMBINED TOTAL $ 616,888.00