My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2016-081
>
Meetings
>
2016
>
06. June
>
2016-06-21 10:00 AM - Commissioners' Agenda
>
Res-2016-081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2018 11:46:10 AM
Creation date
6/13/2018 11:42:56 AM
Metadata
Fields
Template:
Meeting
Date
6/21/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
l
Item
Request to Approve a Resolution to Amend the 2014 Grant Application for Westside and Huntzinger Roads HSIP Project and Authorize the Signature of the County Road Engineer on the Amended Grant Application
Order
12
Placement
Consent Agenda
Row ID
30235
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM <br />NO. <br />0001 <br />0035 <br />0049 <br />0187 <br />0310 <br />0431 <br />0470 <br />1160 <br />1163 <br />1164 <br />1165 <br />3091 <br />3541 <br />3542 <br />4006 <br />4013 <br />4025 <br />4410 <br />5100 <br />5120 <br />5767 <br />5830 <br />5835 <br />5837 <br />SEI #A11178.26 <br />Project: Westside Road <br />Designed By: MJS <br />n~ P loiD ) ')to:t lO{) '"?oS +OC t-c> <br />~(\.""(C\) "3r:2..~ 00 <br />File: Estimate30Sto312.xlsx <br />Date: 3/25/2014 <br />Page 1 <br />CONSTRUCTION COST ESTIMATE <br />ITEM DESCRIPTION UNIT QTY UNIT COST COST <br />PREPARATION <br />MOBILIZATION L.S. 1 $ 23,000.00 $ 23,000 <br />CLEARING AND GRUBBING L.S. 1 $ 640 .00 $ 640 <br />REMOVING DRAINAGE STRUCTURE EACH o $ 1,000.00 $ <br />REMOVING PAINT LINE L.F. 700 $ 1.00 $ 700 <br />GRADING <br />ROADWAY EXCAVATION INCL. HAUL C.Y. 73 $ 10.00 $ 730 <br />GRAVEL BORROW INCL. HAUL TON 231 $ 10.00 $ 2,310 <br />EMBANKMENT COMPACTION C.Y. 114 $ 2.50 $ 285 <br />DRAINAGE <br />UNDERDRAIN PIPE 6 IN. DIAM. L.F. o $ 11.00 $ <br />UNDERDRAIN PIPE 12 IN. DIAM . L.F. o $ 45.00 $ <br />UNDERDRAIN PIPE 15 IN. DIAM . L.F. 90 $ 50.00 $ 4,500 <br />UNDERDRAIN PIPE i81N. DIAM. L.F. o $ 50.00 $ <br />STORM SEWER <br />.CATCH BASIN TYPE 1 EACH o $ 1,500 .00 $ <br />SCHEDULE A STORM SEWER PIPE 121N. DIAM . L.F. o $ 45.00 $ <br />SCHEDULE A STORM SEWER PIPE i81N. D1AM . L.F. o $ 50 .00 $ <br />STRUCTURE <br />STRUCTURE EXCAVATION CLASS A INCL. HAUL C.Y. 76 $ 15 ,00 $ 1,140 <br />SHORING OR EXTRA EXCAVATION CL. A L.S. 1 $ 9,130.00 $ 9,130 <br />GRAVEL BACKFILL FOR WALL C.Y. 20 $ 40.00 $ 800 <br />BRIDGE RAILING TYPE THRIE BEAM L.F. 117 $ 300.00 $ 35,100 <br />RETAINING WALL L.S. 1 $ 16,600.00 $ 16,600 <br />SURFACING <br />CRUSHED SURFACING BASE COURSE TON 85 $ 17.00 $ 1,445 <br />CRUSHED SURFACING TOP COURSE TON 43 $ 25 .00 $ 1,075 <br />HOT MIXED ASPHALT <br />HMA CL. 1/2 IN. PG 64·28 TON 51 $ 80.00 $ 4,080 <br />JOB MIX COMPLIANCE PRICE ADJUSTMENT CALC 1 $ 12,000.00 $ 12,000 <br />COMPACTION PRICE ADJUSTMENT CALC 1 $ 15,000.00 $ 15,000 <br />ASPHALT COST PRICE ADJUSTMENT CALC 1 $ 15,000.00 $ 15,000
The URL can be used to link to this page
Your browser does not support the video tag.