Laserfiche WebLink
ITEM <br />NO. <br />0001 <br />0035 <br />0049 <br />0187 <br />0310 <br />0431 <br />0470 <br />1160 <br />1163 <br />1164 <br />1165 <br />3091 <br />3541 <br />3542 <br />4006 <br />4013 <br />4025 <br />4410 <br />5100 <br />5120 <br />5767 <br />5830 <br />5835 <br />5837 <br />SEI #A11178.26 <br />Project: Westside Road <br />Designed By: MJS <br />n~ P loiD ) ')to:t lO{) '"?oS +OC t-c> <br />~(\.""(C\) "3r:2..~ 00 <br />File: Estimate30Sto312.xlsx <br />Date: 3/25/2014 <br />Page 1 <br />CONSTRUCTION COST ESTIMATE <br />ITEM DESCRIPTION UNIT QTY UNIT COST COST <br />PREPARATION <br />MOBILIZATION L.S. 1 $ 23,000.00 $ 23,000 <br />CLEARING AND GRUBBING L.S. 1 $ 640 .00 $ 640 <br />REMOVING DRAINAGE STRUCTURE EACH o $ 1,000.00 $ <br />REMOVING PAINT LINE L.F. 700 $ 1.00 $ 700 <br />GRADING <br />ROADWAY EXCAVATION INCL. HAUL C.Y. 73 $ 10.00 $ 730 <br />GRAVEL BORROW INCL. HAUL TON 231 $ 10.00 $ 2,310 <br />EMBANKMENT COMPACTION C.Y. 114 $ 2.50 $ 285 <br />DRAINAGE <br />UNDERDRAIN PIPE 6 IN. DIAM. L.F. o $ 11.00 $ <br />UNDERDRAIN PIPE 12 IN. DIAM . L.F. o $ 45.00 $ <br />UNDERDRAIN PIPE 15 IN. DIAM . L.F. 90 $ 50.00 $ 4,500 <br />UNDERDRAIN PIPE i81N. DIAM. L.F. o $ 50.00 $ <br />STORM SEWER <br />.CATCH BASIN TYPE 1 EACH o $ 1,500 .00 $ <br />SCHEDULE A STORM SEWER PIPE 121N. DIAM . L.F. o $ 45.00 $ <br />SCHEDULE A STORM SEWER PIPE i81N. D1AM . L.F. o $ 50 .00 $ <br />STRUCTURE <br />STRUCTURE EXCAVATION CLASS A INCL. HAUL C.Y. 76 $ 15 ,00 $ 1,140 <br />SHORING OR EXTRA EXCAVATION CL. A L.S. 1 $ 9,130.00 $ 9,130 <br />GRAVEL BACKFILL FOR WALL C.Y. 20 $ 40.00 $ 800 <br />BRIDGE RAILING TYPE THRIE BEAM L.F. 117 $ 300.00 $ 35,100 <br />RETAINING WALL L.S. 1 $ 16,600.00 $ 16,600 <br />SURFACING <br />CRUSHED SURFACING BASE COURSE TON 85 $ 17.00 $ 1,445 <br />CRUSHED SURFACING TOP COURSE TON 43 $ 25 .00 $ 1,075 <br />HOT MIXED ASPHALT <br />HMA CL. 1/2 IN. PG 64·28 TON 51 $ 80.00 $ 4,080 <br />JOB MIX COMPLIANCE PRICE ADJUSTMENT CALC 1 $ 12,000.00 $ 12,000 <br />COMPACTION PRICE ADJUSTMENT CALC 1 $ 15,000.00 $ 15,000 <br />ASPHALT COST PRICE ADJUSTMENT CALC 1 $ 15,000.00 $ 15,000