Laserfiche WebLink
• Watercourse <br />• Distance to Major Road <br />• Haul Distance to Landfill <br />• Depth to Groundwater <br />• No. of Owners <br />• Permitability <br />• View <br />• No. of Neighbors <br />• Hauling Distance <br />• Location of Utilities <br />• Type of Owner <br />• Development Cost <br />• Land Use <br />• Topography <br />CH2M will facilitate a project workshop with the project team in evaluating and selecting <br />secondary siting criteria, develop performance measures, and establish relative weights for <br />each criteria. A project workshop summary will be developed and transmitted to workshop <br />attendees. <br />Deliverables <br />Workshop agenda and meeting summary. <br />Assumptions <br />Workshop attended in-person by Tom Parker and Lyndsey Lopez. <br />Workshop attended via conference call by Penny Mabie, Keith Gordon, Bo Bruner, and <br />Scott Gamble <br />Task 3.3 Secondary Site Screening <br />CH2M will conduct a secondary site screening of potential sites (up to 4) that passed the initial <br />screening criteria and establish performance measures. Initial site rankings will be summarized <br />in matrix format. A brief description will be developed for each site, initial and secondary siting <br />criteria, and selected performance measure. <br />CH2M will conduct an in-person project meeting with County staff to discuss results of the <br />initial ranking and a technical memorandum will be developed. <br />Deliverables <br />Meeting agenda and meeting summary. <br />Draft and Final Initial and Secondary Screening Technical Memorandum <br />Assumptions <br />One project meeting attended in-person by Tom Parker and attended via conference <br />call by Lyndsey Lopez, Keith Gordon, and Scott Gamble. <br />County will provide one round of consolidated comments on the technical <br />memorandum.