Laserfiche WebLink
Itemized list of the design, surface materials, drainage, parking area <br />hard costs: <br />ESTIMATE <br />3 -24" x 20' Corrugated metal pipe <br />2 -12" x 20' Corrugated metal pipe <br />1 -24" x 12" Corrugated metal pipe Y <br />1 -20Ton 1 }ii" crushed rock <br />1 -Asphalt shoulder repair <br />10hrs. - Track hoe plus operator <br />4 hrs. -Grader plus operator <br />4 hrs. -Dump truck plus operator <br />40 hrs. -labor <br />1 -Design and permitting <br />TOTAL ESTIMATE <br />$ 1,800 <br />600 <br />500 <br />600 <br />2,200 <br />1,000 <br />400 <br />400 <br />2,600 <br />3,900 <br />------------- <br />$ 14,000 <br />4. Real Property: If real property acquisition is a component of the project, please explain. <br />Include any information of property already secured or evidence of the ability to secure the <br />real property. Real property acquisition is not a component of this project. <br />5. Capital Assets: If capital asset acquisition is a component ofthe project, please explain. <br />Include any bids solicited and received from potential vendors willing to supply the asset. All <br />capital asset purchases require at least three bids. If you have already selected one of the <br />bids, please provide justifications in writing. <br />The directional and information signage as well as the trail head kiosk will be capitol asset <br />acquisitions for this project. <br />There are no bids submitted for this project. The justification for not soliciting any bids is <br />that the City of Cle Elum has a direct cost advantage in that it can provide labor and some <br />materials for these capitol assets. This places the cost of the project far below any bid that <br />would be received from the open market. <br />6. Coordination: Please explain how this project has been coordinated with other jurisdictions <br />as well as affected stakeholders. Please include letters of support from stakeholders. <br />6