My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 14 for the Kittitas Highway Improvements Project
>
Meetings
>
2016
>
01. January
>
2016-01-19 10:00 AM - Commissioners' Agenda
>
Change Order No. 14 for the Kittitas Highway Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2018 8:42:05 AM
Creation date
6/13/2018 10:43:02 AM
Metadata
Fields
Template:
Meeting
Date
1/19/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
p
Item
Request to Approve a Resolution to Approve Change Order No. 14 for the Kittitas Highway Improvements Project
Order
16
Placement
Consent Agenda
Row ID
27518
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K:ITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />Mark Cook, Director <br />CHANGE ORDER JUSTIFICA TION & COST ANAL YSIS <br />Date: January 19, 2016 <br />Project Name: Kittitas Highway Safety Improvements <br />Project Number: RC 1545-J1 <br />Prepared by: Roy Chance, Construction Manager <br />Justification: <br />Change Order #14 <br />Throughout the project numerous bid items exceeded contract quantity associated with the <br />following construction operations. <br />Project inspection identified multiple culverts in need of repair, extension or replacement that <br />were unanticipated because their condition could not be assessed until exposure during <br />construction . <br />Further, the project encountered an increase in concrete slab replacement volume necessitated <br />upon discovery of deteriorated existing condition after exposure. <br />A significant increase in the paint line removal pay item was experienced due to the old paint <br />line's relationship to design road centerline. To facilitate proper location of the new paint line, <br />the old paint line needed to be removed . <br />Unsuitable material at various locations resulted in excavation increases and suitable <br />replacement material increases . <br />Cost analysis: <br />The contractor offered extensions of unit costs on all material over runs, which was deemed <br />reasonable by Public Works . <br />411 N. Ruby St., Suite #1 <br />Ellensburg, WA 98926 <br />TEL (509) 962-7523 <br />FAX (509) 962-7663
The URL can be used to link to this page
Your browser does not support the video tag.