Change Order No. 11 for the Teanaway Road Paving Project
>
Meetings
>
2016
>
01. January
>
2016-01-05 10:00 AM - Commissioners' Agenda
>
Change Order No. 11 for the Teanaway Road Paving Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2018 8:42:05 AM
Creation date
6/13/2018 10:43:00 AM
Metadata
Fields
Template:
Meeting
Date
1/5/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
n
Item
Request to Approve a Resolution and Change Order No. 11 for the Teanaway Road Paving Project
Order
14
Placement
Consent Agenda
Row ID
27208
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K ITTITAS C O U NTY <br />DEPARTMENT OF PUBLIC WORKS <br />Mark Cook , Director <br />[ CH ANGE ORDE R JUSTIFICATION & COST ANAL YSIS I <br />Date: January 5, 2016 <br />Project Name: Teanaway Paving Project <br />Project Number: RC 1560-81 <br />Prepared by: Roy Chance , Construction Manager <br />Justification: <br />Change Order #11 <br />A significant amount of Hot Mix Aspha lt was needed to pre-level the roadway and achieve the <br />design cross slope throughout the entire length of the proj ect. The exist ing roadway crown was <br />"rounded " and d id not support the design cross-section. The add itional amount of hot m ix <br />asphalt re-establishing roadway crown was not anticipat ed during final e ng ineering plan <br />preparation . <br />Quantity over runs in beam guard ra il, posts , non-flared terminals , anchors , labor and traffic <br />contro l were also experienced when guardrai l sections we re added , or fie ld adjusted due tos ite <br />cond it ions not anticipated during final plan prepa ration . <br />Cost analysis: <br />The contractor offered extensions of un it costs on a ll material over runs , wh ich was deemed <br />reasonable by Public Works . The unit costs are the same as those subm itted by the contractor <br />in the original bid as awarded by the Board of County Commissioners . <br />411 N Ruby St., Suite #1 <br />Ellensburg, WA 98926 <br />TEL (509) 962-7523 <br />FAX (509) 962-7663