Laserfiche WebLink
AGREEMENT GCB 2170 <br />EXHIBIT "B" COST ESTIMATE <br />Design and Construct .Park and Ride Lot <br />Project: 1-90 Exit 78 Park and Ride Lot <br />NO. DESCRIPTION <br />-Design Phase - <br />1 <br />Environmental documentation , survey, design, p lans, <br />specifications and estimate (PS&E) preparation, <br />advertisement, award contract <br />DesiQn Total <br />-Construction Phase - <br />2 <br />Construct by Contract: ciear, grade, drain, fence , <br />surface, pave HMA, stripe, curb, sign, illumumination <br />storm water mitigation and appurtenances . <br />3 Wa St Sales Tax (Amount on State R/W) = $ 110,577 <br />Contract Subtotal <br />4 Construction Engineering & Administration <br />5 Contract Contingencies (4%) <br />6 Pavement Repair & Seeding by State Forces <br />Construction Total <br />Total Agreement Amount <br />Notes: Maximum amount available for this Project is $223,000 <br />Appurtenances may include but are not limited to: <br />Charging station and information center <br />Appurtenances may be added per Agreement Section 4. <br />'Contract Change ' after bid award, when remaining funds <br />can be determined . <br />Contract Contingency funds may be utilized when <br />approaching the end of the contract work. <br />Agreement GCB 1725 Exhibit A -Cost Estimate <br />AMOUNT <br />$ 50,500 <br />$ 50,500 <br />$ 110 ,577 <br />8.0% $ 8,846 <br />$ 119,423 <br />$ 43,800 <br />$ 4,777 <br />$ 4,500 <br />$ 172,500 <br />$ 223,000 <br />Sheet 1 of 1