<br /> <br />9 <br /> <br />Suggested Conditions of Approval: <br /> <br />1. The project shall proceed in substantial conformance with the plans and application materials on file dated <br />March 23rd, 2018 except as amended by the conditions herein. <br /> <br />2. The applicant is responsible for compliance with all applicable local, state and federal rules and regulations, <br />and must obtain all appropriate permits and approvals. <br /> <br />3. This application is subject to the latest revision of the MountainStar Development Agreement. The <br />MountainStar Conceptual Master Plan, Environmental Impact Statement, General Site Plans and Site <br />Development Plans which govern development within the Master Planned Resort. <br /> <br />4. It is the responsibility of the applicant to contact the Kittitas County Assessor’s and Treasurer’s offices to <br />confirm all taxes are current prior to final plat approval. <br /> <br />5. Computer sheets shall be submitted with the final plat showing the closure of plat boundaries, blocks, lots or <br />any tract. It is the responsibility of the Professional Licensed Surveyor (PLS) to ensure the lot closures are <br />correct and accurate. <br /> <br />6. The Final Plat shall meet all requirements of applicable law as defined in the Development Agreement. <br /> <br />7. The Final Plat shall contain the name of the Engineer/Surveyor responsible for preparing the documents. <br /> <br />8. Water availability certificates shall be provided by Suncadia Water System LLC for each of the 10 lots <br />created by this subdivision. <br /> <br />9. All development, design and construction shall comply with all applicable laws as defined in the <br />Development Agreement. <br /> <br />10. Lot and road dimensions are to be shown on the face of the plat. <br /> <br />11. The applicant shall contact the Kittitas County Rural Addressing Coordinator at (509) 962-7523 to obtain <br />addresses prior to obtaining a building permit. <br /> <br />12. Civil Plans will be reviewed and approved as submitted prior to final plat approval in accordance with the <br />Development Agreement. <br /> <br />13. Required Infrastructure and Utilities, as defined in the Development Agreement, shall be installed and <br />completed or bonded or other financial guaranties or accommodations made for their completion prior to final <br />plat approval of each subphase. <br /> <br />14. Timing of Improvements: Per the Suncadia 2009 Development Agreement section 5.3 Infrastructure, Surety <br />Bonding or Other Assurances. Infrastructure identified by Trendwest in an approved Site Development Plan <br />must be provided and available for use before the issuance of the first certificate of occupancy for Master <br />Planned Resort Accommodation Units included with such plan. For purposes of final plat approval or <br />issuance of building permits, infrastructure may be guaranteed through surety bonding or other financial <br />assurance device acceptable to the County. The estimated costs of providing all such guaranteed <br />Infrastructure shall be reviewed and approved by the County Public Works Director or designee. Surety <br />bonding or other financial device provided to the County shall be in an amount equal to at least 110% of such <br />estimated costs as determined by Trendwest’s architects and engineers. <br />