My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interagency Agreement between DOE and KCPHD
>
Meetings
>
2018
>
06. June
>
2018-06-05 10:00 AM - Commissioners' Agenda
>
Interagency Agreement between DOE and KCPHD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2018 1:15:02 PM
Creation date
5/31/2018 1:14:23 PM
Metadata
Fields
Template:
Meeting
Date
6/5/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
o
Item
Request to Approve a Resolution Authorizing an Interagency Agreement between the Department of Ecology and the Kittitas County Public Health Department
Order
15
Placement
Consent Agenda
Row ID
45299
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
State of Washington, Department of Ecology <br />IAA No. C1800153 <br />6. All registers must have the following configurable water consumption data functions: Leak <br />detection, high usage, zero usage, and backflow detection. <br />7. All registers must have an external antenna port. <br />Installation Specifications: <br />1. Functional AMI -capable meters must be installed by a licensed plumber or contractor prior to the <br />"Building Permit Final Inspection" approval. <br />2. Documentation (e.g., installers invoice) of installation, including the following information, must <br />be sent to Ecology. <br />a. Name, mailing address, and site address of property\well owner <br />b. Meter serial number <br />c. County tax parcel identification number <br />3. The meter must be installed according to the manufacture specifications despite varying <br />installation conditions. For example: variable pipe -fittings, pipe sizes, well locations, and <br />landscape conditions. <br />4. Meter must be installed in a horizontal pipeline with the register facing upward and readily <br />accessible for reading. To meet accuracy specifications, the meter should not be mounted at more <br />than a 10% angle (either slanted along the pipe or tilted to the side). In most applications, no <br />straight pipe length, upstream or downstream is necessary. <br />5. Meters must be installed 8 to 12 inches below the meter box lid, or as appropriate for location and <br />geographic area. <br />6. The meter box lid must be made of composites (not cast iron). <br />Data Management Requirements: <br />The following parameters are required and must be supplied to Ecology directly through the service <br />provider's data management system or by the County. <br />1. Person\Organization Parameters: <br />a. Last or Organization Name <br />b. First Name <br />c. Address (mailing) <br />d. City (mailing) <br />e. State (mailing) <br />f. Zip Code (mailing) <br />g. Site Address (if different than mailing address) <br />h. Contact Last Name (if different than owner) <br />i. Contact First Name (if different than owner) <br />j. Phone Number <br />k. Phone Type (e.g., home, mobile) <br />1. Email <br />2. Meter Parameters: <br />a. Meter ID (if different then the meter serial number) <br />b. Meter Serial Number <br />c. Register Serial Number <br />d. Meter Type <br />e. Meter Model <br />£ Installed Date <br />g. Meter Location <br />11 <br />Version 8/29/16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.