My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RZ-87-00002_Hyak Amend PUD_FPUD Staging-Phasing Plan amend by STAFF_4.24.18_res att. C
>
Meetings
>
2018
>
05. May
>
2018-05-01 10:00 AM - Commissioners' Agenda
>
RZ-87-00002_Hyak Amend PUD_FPUD Staging-Phasing Plan amend by STAFF_4.24.18_res att. C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2018 12:17:02 PM
Creation date
5/14/2018 12:16:54 PM
Metadata
Fields
Template:
Meeting
Date
5/1/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
c
Item
Continued Closed Record Meeting to Consider Approval of the Amended Hyak PUD Rezone Final Development Plan (RZ-87-00002)
Order
3
Placement
Board Discussion and Decision
Row ID
44356
Type
Conduct closed record meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Building Permits and home construction may proceed during construction and prior to final <br />platting or bonding of any Division with Occupancy Permits for said home construction issued <br />upon and simultaneously with final platting or bonding of said division. <br />The project may be developed over a period of 20 years with a possible five-year extension. It is <br />the Project's goal to be complete within a twenty-year period but as has been experienced during <br />previous years political, environmental, economic, and development cycles may increase or <br />decrease the development period of the Project. Therefore, the phases and the development period <br />may be slowed or accelerated as circumstances requires or allow. <br />Market and/or weather or seasonal conditions may impact the rate of development. The Project may <br />be accelerated if approvals and conditions allow for said acceleration. The Project may be slowed if <br />approvals, market conditions and/or other conditions cause said slowing. Indoor and or Outdoor <br />Recreation Facilities may be constructed and operated during any of the phases. <br />The land within the recreation open space that is not being developed as home sites may continue to <br />evolve as recreation interests change over the life of the project <br />If approvals occur later then planned or if other actions or conditions delay development the Staging <br />and Phasing of the Project the entire Project may be delayed. The progress of the development of <br />items that include but are not limited to utilities, the transportation corridor and platting delays may <br />accelerate or delay the development of the parcels. <br />The Project is designed in such a manner that each Phase may follow the proceeding Phase but <br />Phases may be constructed simultaneously and at some times out of order. Infrastructure may be <br />constructed beyond the current Phase that is under construction. <br />The following table format will outline the Staging/phasing plan. <br />Building Permits shall only be issued as allowed per platted lot. At no time shall home <br />construction be allowed or building permits issued prior to final platting of any Division that <br />exceeds that allowed by existing platted lots at the time of building permit submittal.
The URL can be used to link to this page
Your browser does not support the video tag.