My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PD-17-00001 Marian Meadows Revised Ordinance with Map 4-10-18 Track Changes
>
Meetings
>
2018
>
04. April
>
2018-04-17 10:00 AM - Commissioners' Agenda
>
PD-17-00001 Marian Meadows Revised Ordinance with Map 4-10-18 Track Changes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2018 1:47:01 PM
Creation date
4/12/2018 1:45:09 PM
Metadata
Fields
Template:
Meeting
Date
4/17/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Request to Approve an Ordinance Granting Approval to Marian Meadows Planned Unit Development (PD-17-00001), Conditional Use Permit (CU-17-00001), and Plat (LP-17-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
44013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> 4 <br />and Public Hearing was issued on September 26, 2017. <br />11. Applicable agencies, adjacent property owners and interested parties were given the opportunity to review <br />the proposal. The following agencies and individuals provided comments: <br /> <br /> 11.1 Washington Department of Fish and Wildlife (WDFW) <br /> <br /> 11.1.1 In a comment letter dated July 20th, 2017, WDFW makes reference to its comments on <br />Draft EIS related to the original proposal in a letter dated April 2nd, 2010, and provides <br />additional comment on the revised proposal. In the original comment letter, WDFW <br />identified several concerns. These included: <br /> <br /> 11.1.1.1 The number of lots was excessive considering the terrain. <br /> <br /> 11.1.1.2 Elimination of mountain goat habitat. <br /> <br /> 11.1.1.3 Habitat connectivity. <br /> <br /> 11.1.1.4 Impacts to Silver Creek, a fish bearing stream. <br /> <br /> 11.1.1.5 Habitat impacts on the steep slopes to the east of the development. <br /> <br /> 11.1.1.6 Alluvial fans and debris flow hazards. <br /> <br /> 11.1.1.7 Firefighting issues. <br /> <br /> The comment letter identified Alternative 5 of the DEIS as the least harmful alternative. <br /> <br /> In its comment letter on the revised proposal, WDFW provides additional concerns. These include: <br /> <br /> 11.1.1.8 Wildlife connectivity and use; <br /> <br /> 11.1.1.9 Alterations to streams; <br /> <br /> 11.1.1.10 Increased fire risk; <br /> <br /> 11.1.1.11 General habitat impacts related to development; <br /> <br /> 11.1.2 WDFW Recommendations <br /> In the two comment letters, the following mitigation measures are recommended: <br /> 11.1.2.1 Adoption of the least harmful alternative, Alternative 5 in the DEIS. <br /> <br /> 11.1.2.2 Exclusion of proposed parcels on the steeper, eastern portion of the site. <br /> <br /> 11.1.2.3 Dedication of the entire area east of the transmission lines as open space <br />with an easement, and development of a management plan for the open
The URL can be used to link to this page
Your browser does not support the video tag.