My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ResolutionAuthorizingCRPNumbersandProjects
>
Meetings
>
2018
>
03. March
>
2018-03-20 10:00 AM - Commissioners' Agenda
>
ResolutionAuthorizingCRPNumbersandProjects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2018 10:02:50 AM
Creation date
4/12/2018 10:02:42 AM
Metadata
Fields
Template:
Meeting
Date
3/20/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
k
Item
Request to Approve a Resolution Authorizing County Road Projects for Multiple Projects and Assigning CRP Numbers
Order
11
Placement
Consent Agenda
Row ID
43308
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOARD OF COUNTY COMMISSIONERS <br />COUNTY OF KITTITAS <br />STATE OF WASHINGTON <br />RESOLUTION NO. 2018 - <br />RESOLUTION AUTHORIZING MULTIPLE COUNTY ROAD PROJECTS AND <br />ASSIGNING CRP NUMBERS <br />WHEREAS: In the matter of initiating county road projects and assigning CRP numbers; and <br />WHEREAS: The roads listed below be improved as shown between the points indicated. <br />These projects are hereby declared to be public necessity and the County Engineer is hereby <br />ordered and authorized to report and proceed thereon as by law provided; and <br />WHEREAS: Appropriations from the officially adopted road fund budget and based on the <br />County Engineer's estimates are hereby made in the amounts and for the purposes shown: <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />in accordance with RCW 36.77.060 and WAC 136-18. <br />E. A.C. or P.C.C. Pavement <br />TYPE OF <br />(Y) This Project is Hereby Made a Part of the Officially Adopted <br />G. Sidewalks <br />COST ESTIMATE (THOUSANDS) <br />H. Traffic Facilities <br />36.81.130. <br />ROAD NAME <br />ROAD <br />J. PATHS & TRAILS (RCW 47.30) <br />WORK (See <br />o <br />Annual <br />AND/OR BRIDGE <br />LOG <br />Code) <br />m <br />g <br />Const. <br />NUMBER <br />NO. <br />z <br />Prog. <br />CRP <br />ALL (4) <br />oU <br />o <br />Engin. & <br />Item No. <br />No. <br />R.O.W. CONSTRUCTION <br />M.P. TO M.P. <br />GRANT <br />LOCAL <br />Roadside Hazard <br />VARIES <br />VAR <br />VAR <br />A,H <br />X <br />58 <br />691 <br />159 <br />2 <br />27847— <br />Safety <br />Improvement <br />Fairview Road <br />63500 <br />5.03 <br />6.05 <br />A,B,I,E,H,C <br />X <br />250 <br />2000 <br />7 <br />279-18 <br />Nabeum Road <br />42000 <br />4.11 <br />4.86 <br />A,C,E,H <br />X <br />80 <br />650 <br />8 <br />280-18 <br />Wiehl Road <br />N/A <br />PRIV <br />PRIV <br />A.B.C.E.H <br />X <br />300 <br />350 <br />4 <br />281-18 <br />University Way <br />93041 <br />1.61 <br />1.61 <br />I,A,E <br />X <br />175 <br />5 <br />282-18 <br />/BR#88342 <br />Mohar Road <br />22350 <br />1.75 <br />2.01 <br />A,C,E,H <br />X <br />45 <br />500 <br />11 Y <br />283-18 <br />Kachess Lake Rd <br />12550 <br />2.50 <br />2.50 <br />A,C,E,H <br />X <br />60 <br />600 <br />12 Y <br />284-18 <br />Bender Road <br />93075 <br />0.00 <br />0.68 <br />A,B,C,E,H,G, <br />X <br />350 <br />2358 <br />192 <br />13 Y <br />285-18 <br />F <br />Bar 14 Road <br />42512 <br />0.24 <br />0.25 <br />1 A,B,C <br />X. <br />10 <br />90 <br />9 <br />286-18 <br />Turnaround <br />Dolarway <br />WSDOT <br />VAR <br />VAR <br />C,F,G, <br />X <br />445 <br />14 Y <br />289-18 <br />Roundabout <br />(4) f YPE OF WORK CODE <br />(5) The construction is to be accomplished by contract in <br />A. Preliminary Engineering <br />accordance with RCW 36.77.020 et. seq. <br />B. Right-of-way <br />C. Grading, Draining, Surfacing <br />(6) The construction is to be accomplished by county forces <br />D. Light Bit. Surf. Treatment <br />in accordance with RCW 36.77.060 and WAC 136-18. <br />E. A.C. or P.C.C. Pavement <br />F. Curbs & Gutters <br />(Y) This Project is Hereby Made a Part of the Officially Adopted <br />G. Sidewalks <br />Annual Road Construction Program In Accordance with RCW <br />H. Traffic Facilities <br />36.81.130. <br />I. Bridge Construction <br />J. PATHS & TRAILS (RCW 47.30) <br />
The URL can be used to link to this page
Your browser does not support the video tag.