Laserfiche WebLink
$2.5197 unleaded $2.7213 mid <br />Petroleum and Lubricant Products for 2018 <br />leaded $2.8822 premleaded $2.9227 <br />Schedule A <br />Al Petroleum <br />Ethanol free $2.7213 Ethanol free mid <br />1/16/2018 <br />RES #2018-012 <br />$2.4427 Diesel <br />Petroleum and Lubricant Products for 2018 <br />$2.3939 un leaded $2.6338 mid leaded <br />Schedule <br />Amerifuel <br />$1.2883 Diesel <br />1/16/2018 <br />RES #2018-012 <br />Petroleum and Lubricant Products for 2018 <br />Schedule C <br />Al Petroleum <br />$20,742.05 <br />1/16/2018 <br />RES #2018-012 <br />Geotechnical, Environment, Hydraulic, and <br />$327,653.00 Maximum Amount <br />Real Estate Services <br />Jacobs Engineering Group Inc. <br />Payable <br />10/17/2017 <br />RES #2017-170 <br />Manastash Creek Bridge Replacement - <br />$279,603.00 Maximum Amount <br />Design of replacement structure <br />Jacobs Engineering Group Inc. <br />Payable <br />8/15/2017 <br />RES #2017-136 <br />Kittitas County Comprehensive Plan <br />$111,850.00 Maximum Amount <br />Amendment- Transportation Element <br />Jacobs Engineering Group Inc. <br />Payable <br />3/8/2017 <br />RES #2017-050 <br />SVH Load Ratings -All Kittitas County Bridges <br />KPFF Consulting Engineers <br />$99,259.00 Maximum Amount <br />6/20/2017 <br />RES #2017-101 <br />Payable <br />Road No. 6 Bridge Design <br />KPFF Consulting Engineers <br />$87,500.00 Maximum Amount <br />7/18/2017 <br />RES #2017-115 <br />Payable <br />