My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PD-17-00001 Marian Meadows Full Record with Index (2)
>
Meetings
>
2018
>
03. March
>
2018-03-06 10:00 AM - Commissioners' Agenda
>
PD-17-00001 Marian Meadows Full Record with Index (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2018 2:21:02 PM
Creation date
4/10/2018 12:02:05 PM
Metadata
Fields
Template:
Meeting
Date
3/6/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Closed Record Meeting to Consider the Hearing Examiner's Recommendation for Marian Meadows Planned Unit Development (PD-17-00001) Conditional Use Permit (CU-17-00001) and Plat (LP-17-0001)
Order
1
Placement
Board Discussion and Decision
Row ID
42915
Type
Conduct closed record meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1800
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Marian Meadows Rezone and Subdivision Final Environmental Impact Statement 3-119 <br />uses may be subject to enforcement activities, but such enforcement is likely to be ineffective in <br />controlling the demand for such use, absent adequate designated facilities in the area. The major effect of <br />the project on adjacent public lands owned by the Forest Service and Washington DNR is likely to be <br />continued long-term chronic enforcement problems. Because of the difficulty of enforcing restrictions on <br />highly mobile uses such as ORV and snowmobiles, in the absence of a designated trail system continued <br />use of informal trails would likely result in impacts of erosion and disturbance of wildlife. <br />Alternatives 1 and 2 recreation impacts would result from a community roughly equivalent to the size of <br />the communities of Kittitas or Roslyn. Table 3-17 indicates the range of potential demand for a variety of <br />types of park that may result from a community of that size. The proposed provision of 1.88 acres of park <br />at three locations would not meet Kittitas County standards and would be much less than NRPA <br />guidelines. Other potential areas for recreation are present on the site, including the BPA transmission <br />line easement, which is currently used by off-road vehicles and snowmobiles. The proposal includes no <br />formal designation of trails to meet the County standards of between a third and a little more than half a <br />mile of trails. The proposal includes no formal connections to allow potential open space use of public <br />land at the Easton State Airport or the National Forest to the northeast and north of the site. Informal <br />access to that public land likely would continue along the BPA transmission line easement, although that <br />easement passes through a private parcel. The current design makes inadequate provision for shared or <br />public recreation facilities and makes no formal provision for informal off-road and snowmobile activities <br />likely to be used by a substantial proportion of residents. Off-road vehicles and snowmobiles can use <br />roadways; however, the use of unlicensed vehicles presents legal issues and the potential for conflict with <br />motor vehicles at a substantial risk of life to off-road and snowmobile users. <br />Alternative 2 includes a considerable area of open space in debris flow hazard areas that have the <br />potential to provide for informal and formal parks and recreation use, if developed for that purpose. This <br />presumes that the risk to potential users would be acceptable. <br />For these alternatives, the lack of provision for recreation likely would result in either greater use of <br />off-site facilities or a lack of opportunities for recreational activities to serve residents. The population <br />likely served the least would be the demand for youth sports. Off-site facilities most affected would <br />likely be State of Washington lands that provide a buffer area north of the Easton State Airport and U.S. <br />Forest Service land to the north, as well as playfields at the Easton School. <br />Alternatives 3A, 3B, 3C, 3D, 4, and 5 would result with potential populations between 250 and 635, <br />depending on the tenure scenario. There would be no formal provisions for park and recreation facilities <br />because they are intended to be conceptual to illustrate development options. Alternatives 3A, 3B, 3C <br />and 3D with larger lots may be considered to provide more opportunities for private recreation on the lots. <br />All the alternatives with fewer residences would place less demand on off-site facilities.
The URL can be used to link to this page
Your browser does not support the video tag.