My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PD-17-00001 Marian Meadows Full Record with Index (2)
>
Meetings
>
2018
>
03. March
>
2018-03-06 10:00 AM - Commissioners' Agenda
>
PD-17-00001 Marian Meadows Full Record with Index (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2018 2:21:02 PM
Creation date
4/10/2018 12:02:05 PM
Metadata
Fields
Template:
Meeting
Date
3/6/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Closed Record Meeting to Consider the Hearing Examiner's Recommendation for Marian Meadows Planned Unit Development (PD-17-00001) Conditional Use Permit (CU-17-00001) and Plat (LP-17-0001)
Order
1
Placement
Board Discussion and Decision
Row ID
42915
Type
Conduct closed record meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1800
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS (continued) <br />Marian Meadows Rezone and Subdivision Final Environmental Impact Statement x <br /> <br />5 How can construction noise be reduced? ............................................................................................................. 3‐227 <br />6 What long‐term noise disturbance will result from the proposal and alternatives? ............................................ 3‐228 <br />7 What are the likely cumulative impacts with development of nearby land at rural densities or at densities <br />similar to the proposal? ........................................................................................................................................ 3‐229 <br />3.8 Air Quality ................................................................................................................................ 3‐230 <br />1 Are there currently air quality problems in the area? .......................................................................................... 3‐230 <br />2 What air quality standards apply in the area? ...................................................................................................... 3‐231 <br />3 During construction, are air quality problems expected? ..................................................................................... 3‐233 <br />4 What long‐term effects on air quality are expected from the proposal and alternatives? .................................. 3‐233 <br />5 What are the likely cumulative impacts with development of nearby land at rural densities or at densities <br />similar to the PUD proposal? ................................................................................................................................ 3‐235 <br />6 During construction, what measures can reduce air quality effects of the project? ............................................ 3‐235 <br />7 During operation, what measures can reduce air quality effects of the project? ................................................ 3‐236 <br />3.9 Hazardous Materials ........................................................................................................................ 3‐236 <br />1 Are there likely to be hazardous materials in the project area? ........................................................................... 3‐236 <br />2 What hazardous materials could be released during construction? .................................................................... 3‐237 <br />3 What measures would address hazardous materials during construction? ......................................................... 3‐237 <br />4 What long‐term effects could the project and alternatives have on hazardous materials? ................................. 3‐238 <br />5 What are the likely cumulative impacts with development of nearby land at rural densities or at densities <br />similar to the PUD proposal? ................................................................................................................................ 3‐238 <br />6 What measures can reduce potential hazardous material risks? ......................................................................... 3‐238 <br />3.10 Historic, Cultural, And Archaeological Resources .......................................................................... 3‐238 <br />1 What historic, cultural, or archaeological resources are likely to be present in the project area? ...................... 3‐238 <br />2 What policies and regulations govern historic cultural or archaeological resources that may be present on <br />the site or in the vicinity? ..................................................................................................................................... 3‐240 <br />3 What effects on historic, cultural, or archaeological resources may occur from the proposal and alternatives <br />during construction and use? ............................................................................................................................... 3‐241 <br />4 What are the likely cumulative impacts with development of nearby land at densities similar to the <br />proposal? .............................................................................................................................................................. 3‐241 <br />5 What measures could reduce effects on historic, cultural, or archaeological resources? .................................... 3‐241 <br />3.11 Geology, Topography, And Soils .................................................................................................... 3‐242 <br />1 What are the geologic, topographic, and soil conditions in the area? ................................................................. 3‐242 <br />2 What risks or hazards are associated with geology, topography, and soils? ........................................................ 3‐251 <br />3 What policies and standards address geological hazards? ................................................................................... 3‐258 <br />4 How would geology, topography, and soils pose risks or hazards to facilities or persons living in the <br />proposed project area? ........................................................................................................................................ 3‐259 <br />5 What potential is there for utilizing mineral resources on the site? .................................................................... 3‐263 <br />6 What measures may reduce the effects of geology and soils on facilities and persons in the proposed project <br />area? ................................................................................................................................................................... 3‐265 <br />3.12 Surface Water Resources ............................................................................................................... 3‐265 <br />1 What surface water resources are present in the project area? .......................................................................... 3‐265
The URL can be used to link to this page
Your browser does not support the video tag.