Laserfiche WebLink
TABLE OF CONTENTS (continued) <br />Marian Meadows Rezone and Subdivision Final Environmental Impact Statement x <br /> <br />5 How can construction noise be reduced? ............................................................................................................. 3‐227  <br />6 What long‐term noise disturbance will result from the proposal and alternatives? ............................................ 3‐228  <br />7 What are the likely cumulative impacts with development of nearby land at rural densities or at densities  <br />similar to the proposal? ........................................................................................................................................ 3‐229  <br />3.8 Air Quality    ................................................................................................................................ 3‐230  <br />1 Are there currently air quality problems in the area? .......................................................................................... 3‐230  <br />2 What air quality standards apply in the area? ...................................................................................................... 3‐231  <br />3 During construction, are air quality problems expected? ..................................................................................... 3‐233  <br />4 What long‐term effects on air quality are expected from the proposal and alternatives? .................................. 3‐233  <br />5 What are the likely cumulative impacts with development of nearby land at rural densities or at densities  <br />similar to the PUD proposal? ................................................................................................................................ 3‐235  <br />6 During construction, what measures can reduce air quality effects of the project? ............................................ 3‐235  <br />7  During operation, what measures can reduce air quality effects of the project? ................................................ 3‐236  <br />3.9 Hazardous Materials ........................................................................................................................ 3‐236  <br />1 Are there likely to be hazardous materials in the project area? ........................................................................... 3‐236  <br />2 What hazardous materials could be released during construction? .................................................................... 3‐237  <br />3 What measures would address hazardous materials during construction? ......................................................... 3‐237  <br />4 What long‐term effects could the project and alternatives have on hazardous materials? ................................. 3‐238  <br />5 What are the likely cumulative impacts with development of nearby land at rural densities or at densities  <br />similar to the PUD proposal? ................................................................................................................................ 3‐238  <br />6 What measures can reduce potential hazardous material risks? ......................................................................... 3‐238  <br />3.10 Historic, Cultural, And Archaeological Resources .......................................................................... 3‐238  <br />1 What historic, cultural, or archaeological resources are likely to be present in the project area? ...................... 3‐238  <br />2 What policies and regulations govern historic cultural or archaeological resources that may be present on  <br />the site or in the vicinity? ..................................................................................................................................... 3‐240  <br />3 What effects on historic, cultural, or archaeological resources may occur from the proposal and alternatives  <br />during construction and use? ............................................................................................................................... 3‐241  <br />4 What are the likely cumulative impacts with development of nearby land at densities similar to the  <br />proposal? .............................................................................................................................................................. 3‐241  <br />5 What measures could reduce effects on historic, cultural, or archaeological resources? .................................... 3‐241  <br />3.11 Geology, Topography, And Soils .................................................................................................... 3‐242  <br />1 What are the geologic, topographic, and soil conditions in the area? ................................................................. 3‐242  <br />2 What risks or hazards are associated with geology, topography, and soils? ........................................................ 3‐251  <br />3 What policies and standards address geological hazards? ................................................................................... 3‐258  <br />4 How would geology, topography, and soils pose risks or hazards to facilities or persons living in the  <br />proposed project area? ........................................................................................................................................ 3‐259  <br />5 What potential is there for utilizing mineral resources on the site? .................................................................... 3‐263  <br />6 What measures may reduce the effects of geology and soils on facilities and persons in the proposed project  <br />area?  ................................................................................................................................................................... 3‐265  <br />3.12 Surface Water Resources ............................................................................................................... 3‐265  <br />1 What surface water resources are present in the project area? .......................................................................... 3‐265