Laserfiche WebLink
<br /> <br />23 <br /> <br />for a variance with the Board of County Commissioners pursuant to KCC 9.45.070. <br /> <br />34) Air Quality <br /> <br />a) The project shall comply with all applicable local, state and federal laws regulating air quality. <br />b) Current quarry work will impact air quality. The quarry shall be decommissioned at the start of <br />residential construction. <br /> <br />35) Hazardous Materials <br /> <br />Mitigation measures related to hazardous materials are discussed on pg. 3-238 of the FEIS. <br />a) A control and response plan shall be developed deal with hazardous material related to <br />construction. <br />b) Convenient means of safe disposal of any household hazardous materials shall be provided. <br /> <br />36) Historic, Cultural, and Archeological Resources <br /> <br />Mitigation measures related to Historic and Cultural Preservation are discussed on pg. 3-241 of the FEIS. <br />a) The applicant shall formulate a plan for limited subsurface testing in any areas of high probability <br />for containing pre contact and historic resources. <br />b) The applicant shall prepare an inadvertent discovery plan which states applicable state laws and <br />proper procedures that is to be followed if archaeological resources are identified. A contact list <br />of appropriate parties shall be included. <br />c) Should ground disturbing or other activities related to the proposed plat result in the inadvertent <br />discovery of cultural or archaeological materials, work shall be stopped in the immediate area and <br />contact be made with the Washington State Department of Archeology and Historic Preservation. <br />Work shall remain suspended until the find is assessed and appropriate consultation is conducted. <br />Should human remains be inadvertently discovered, as dictated by Washington State RCW <br />27.44.055, work shall be immediately halted in the area and contact made with the coroner or <br />local law enforcement the most expeditious manner possible. <br /> <br />37) Geology, Topology, and Soils <br /> <br />The FEIS examines impacts related to geologic hazards, and proposes mitigation measures (3-265). <br />a) Development on the steep, eastern portion of the site shall require geotechnical analysis prior to, <br />and during construction. <br />b) The alluvial fan area in the northwest corner of the project will be private property with <br />restrictions on for the removal of foliage or land clearing, along with the alluvial fan located in <br />the southern portion of the property. <br />c) After decommissioning, the rock quarry area shall be reclaimed and repurposed into the 100,000 <br />gallon water storage facility required under Water District Resolution 30906.2. <br /> <br />38) Surface Water Resources <br /> <br />Surface water mitigations are examined in the FEIS (pg. 3-277). Development shall comply with all <br />stormwater related state, local and federal regulations. <br />