My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DA-15-00001 Palomino Fields Edited PFDAgrement_FNL 5-27-16_mark-up
>
Meetings
>
2016
>
06. June
>
2016-06-07 2:00 PM - 2:00pm Public Hearing
>
DA-15-00001 Palomino Fields Edited PFDAgrement_FNL 5-27-16_mark-up
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2018 9:15:09 AM
Creation date
4/7/2018 10:59:44 AM
Metadata
Fields
Template:
Meeting
Date
6/7/2016
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
b
Item
Public Hearing Continued from May 17, 2016 to Consider a Proposal to Create a Development Agreement to Allow the Approved Palomino Fields Subdivision to be Completed in Phases. The Record is Closed.
Order
2
Placement
2:00pm Public Hearing
Row ID
29903
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
as established for the Palomino Fields plat as it pertains to that individual parcel. Road <br />drainage shall meet the Eastern Washington Storm Water guidelines. The Applicant shall <br />development the Palomino Fields plat in accordance with to a storm water permit as <br />issued by the Washington State Department of Ecology. Stormwater systems shall be <br />designed in each phase to manage total stormwater of completed phases that is generated <br />by a 24-hour, 25-year storm event. <br />8.4.8.5. Fire Protection. Sprinklers shall be located in each residence will <br />to provide fire Protection for the residence and will be constructed to current standards. <br />Neither system wide storage tanks nor fire hydrants are required for the Project. <br />8.5.8.6. Other Infrastructure Requirements. Utilities including but not <br />limited to dry utilities such as power, phone and internet shall be provided to the property <br />line of each parcel. <br />9. Parks and open space preservation. The Parks and open space preservation for the <br />Palomino Fields plat have been established by Kittitas County through the adoption of <br />Resolution 2008-160 as adopted by Kittitas County Board of County Commissioners on <br />November 18, 2008 and attached hereto as Exhibit D. The identified open space tracts <br />shall be proportionately owned by tenants in the common, and retained by each home <br />owner, and will be assessed, taxed, and foreclosed upon each building lot not fulfilling <br />their obligation. <br />10. Phasing. The project will be constructed and receive final plat approval in <br />individual Phases. The description of the Phasing plan is provided in Exhibit GE, and <br />each phase will occur consecutively in the order as shown in Exhibit E. The Applicant <br />can complete more than one phase with each final plat submittal. <br />11. Development review Review processesProcesses, procedures Procedures and <br />standards Standards for implementing Implementing decisionsDecisions, . including <br />methods of reimbursement to the county for review processes; <br />11.1. Standards For for Implementing Decisions. Kittitas County shall base its <br />decisions on the Kittitas County Code and implement saidper decisions on in Ordinance <br />Resolution 2008-160 as further defined and modified for phased development by this <br />document.
The URL can be used to link to this page
Your browser does not support the video tag.