Laserfiche WebLink
8.5. Fire Protection. Sprinklers shall be located in each residence to provide <br />fire Protection for the residence and will be constructed to current standards. Neither <br />system wide storage tanks nor fire hydrants are required for the Project. <br />8.6. Other Infrastructure Requirements. Utilities including but not limited to <br />dry utilities such as power, phone and internet shall be provided to the property line of <br />each parcel. <br />9. Parks and open space preservation. The Parks and open space preservation for the <br />Palomino Fields plat have been established by Kittitas County through the adoption of <br />Resolution 2008-160. The identified open space tracts shall be proportionately owned by <br />tenants in the common, and retained by each home owner, and will be assessed, taxed, <br />and foreclosed upon each building lot not fulfilling their obligation. <br />10. Phasing. The project will be constructed and receive final plat approval in <br />individual Phases. The description of the Phasing plan is provided in Exhibit E, and each <br />phase will occur consecutively in the order as shown in Exhibit E. The Applicant can <br />complete more than one phase with each final plat submittal. <br />11. Development Review Processes, Procedures and Standards for Implementing <br />Decisions. <br />11.1. Standards for Implementing Decisions. Kittitas County shall base its <br />decisions on the Kittitas County Code and per decisions in Resolution 2008-160 as <br />further modified for phased development by this document. <br />11.2. Plat Application. The County will process the final plat for each phase of <br />the approved preliminary plat as defined in KCC Title 16. Each final plat will be <br />assessed processing fees as exist at the time of submittal. <br />11.3. SEPA Determination. The County has reviewed, processed and issued a <br />Mitigated Determination of Non -significance (MDNS) for the preliminary Palomino <br />Fields subdivision and such determination shall be used for impact evaluation. Each final <br />plat will be evaluated in terms of its contribution to the 24-hour, 25 -year storm event for <br />the accumulation of all finaled plats within the Palomino Fields project. <br />11.4. Roads. The County will review and approve engineering designs of <br />road(s) and other infrastructure elements within the County right of way. Any private and <br />