My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DA-15-00001 Palomino Fields PFDAgreement FNL with A-E
>
Meetings
>
2016
>
06. June
>
2016-06-07 2:00 PM - 2:00pm Public Hearing
>
DA-15-00001 Palomino Fields PFDAgreement FNL with A-E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2018 9:15:19 AM
Creation date
4/7/2018 10:59:31 AM
Metadata
Fields
Template:
Meeting
Date
6/7/2016
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
b
Item
Public Hearing Continued from May 17, 2016 to Consider a Proposal to Create a Development Agreement to Allow the Approved Palomino Fields Subdivision to be Completed in Phases. The Record is Closed.
Order
2
Placement
2:00pm Public Hearing
Row ID
29903
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V. Light and Aesthetics <br />A. All outdoor lighting shall be shielded and directed downward to minimize the <br />effect to nearby residential properties. <br />VI. Noise <br />A. Construction activities shall comply with KCC 9.45 (Noise). Construction <br />hours shall be from 7:OOam to 7:OOpm. <br />VII. Land and Shoreline Use <br />A. Wetland and Wildlife study will be required, prior to final approval, <br />establishing the appropriate buffers regarding sensitive areas as determined by <br />the consultant. <br />B. One hundred foot buffers will be established along Currier Creek and shown <br />on the final mylars. <br />C. A riparian management plan that would incorporate signage for Currier Creek <br />will be completed prior to final approval. <br />D. All waterways/waters/ditches located on the subject property, regardless of <br />their designation of intermittent, perennial or ephemeral shall be delineated <br />and shown on the final mylars. Improvements to such water features shall not <br />impact on-site and off-site use. <br />E. A Hydraulic Project Approval (IPA) from the Department of Fish & Wildlife <br />shall be required for all work affecting watercourses, including those that do <br />not flow year-round. This includes, but is not limited to, work associated with <br />construction of bridges, culverts, drainage facilities, outfalls and other <br />construction affecting the bed, bank or flow of watercourses. <br />F. The applicant shall consult with the Department of Fish & Wildlife to <br />determine the appropriate size of culvert needed for the crossing of any stream <br />or watercourse on the subject property. Prior to final approval the applicant <br />will provide documentation that said crossings meet the proposed standards. <br />VIII. Public Safety <br />A. The applicant shall consult with the local school district and provide for and <br />depict on the final mylars a safe location for a bus stop. <br />P-07-31 <br />Palomino Fields Preliminary Plat <br />Page 13 of 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.