My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DA-15-00001 Palomino Fields Master File
>
Meetings
>
2016
>
05. May
>
2016-05-17 2:00 PM - 2:00pm Public Hearing
>
DA-15-00001 Palomino Fields Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2018 9:15:14 AM
Creation date
4/7/2018 10:52:04 AM
Metadata
Fields
Template:
Meeting
Date
5/17/2016
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to Consider a Proposed Development Agreement to Allow Preliminary Plat, Palomino Fields, to Receive Final Plat Review in Five Separate Phases.
Order
1
Placement
2:00pm Public Hearing
Row ID
29616
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Washington <br />Department of <br />FISH and <br />WILDLIFE <br />HYDRAULIC PROJECT APPROVAL <br />RCW 77.55.021 (AG) - Appeal to Hyraulic Appeals Board <br />RCW 77.55.021 - Appeal pursuant to Chapter 34.05 <br />Issue Date: December 31, 2007 <br />Project Expiration Date: August 31, 2008 <br />Control Number: <br />FPA/Public Notice #: <br />South Central <br />1701 South 24th Avenue <br />Yakima, WA 98902-5720 <br />(509) 575-2740 <br />111603-1 <br />N/A <br />16. The temporary flow bypass shall be established through the work area prior to initiation of work <br />to remove the existing diversion. Sandbags or equivalent clean materials shall be installed as <br />necessary to isolate the work area from the watercourse. The bypass shall be only as long as <br />necessary to prevent seepage or backwatering of the work area. The temporary bypass shall be -of <br />sufficient size to pass flow and debris occurring during the project. <br />17. A dam of sandbag and plastic sheeting or equivalent clean structure shall be used to divert the <br />entire flow of Currier Creek through the bypass. If necessary to prevent backwater from entering <br />the work area, an equivalent, clean structure shall be installed at the downstream end of the <br />bypass. <br />18. A fish salvage is required and shall take place in the coffered off portion of the project, prior to <br />removal of the diversion. Fish trapped inside of work areas shall be captured and released . <br />unharmed down river of the project. The Department of Fish and Wildlife will provide a crew to <br />accomplish this task. The project contractor shall provide a 7 -day notice prior to initiating <br />construction in order to arrange for crews and have a pre -work meeting. <br />19. Upon completion of the project, all temporary bypass facilities shall be removed. Materials used <br />for temporary diversion and containment structures (other than washed gravel) shall be removed <br />from the site. <br />DIVERSION REMOVAL AND DISPOSAL OF WASTE MATERIAL <br />20. Alteration of the channel shall be limited to the minimum necessary to remove the old diversion <br />structure and associated fill, debris, tarps, boards etc. <br />21. All old fill and associated concrete, steel, or other debris used to .armor the old diversion shall be <br />removed from the streambed and disposed of in an approved upland site. <br />22. Road fill surrounding the existing diversions and footings shall be carefully removed prior to any <br />demolition work on the existing diversion. After the road fill has been removed, the existing <br />diversions shall be carefully removed. All waste material and excess fill shall be removed <br />completely from the channel and disposed of in an approved upland location where it will not affect <br />flood plains or wetlands. Removed fill shall not be placed within the 100 -year floodplain. <br />23. The temporary bypass shall remain in place until the old diversion has been removed, the <br />slopes have been recontoured and the washed stream gravel and boulders have been installed in <br />the disturbed streambed areas. <br />24. Before water is diverted into the permanent new channel, the streambed gravel shall be in <br />place; the streambanks shall be protected from erosion using erosion control blankets or similar <br />means, and planted. <br />25. The new channel shall be excavated and shaped as per plans. This channel shall be <br />constructed in the dry. <br />Page 3 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.