Laserfiche WebLink
Washington <br />Department of <br />FISH and <br />WILDLIFE <br />HYDRAULIC PROJECT APPROVAL <br />RCW 77.55.021 (AG) -Appeal to Hyraulic Appeals Board <br />RCW 77.55.021 - Appeal pursuant to Chapter 34.05 <br />Issue Date: December 31, 2007 <br />Project Expiration Date: August 31, 2008 <br />Control Number: <br />FPA/Public Notice #: <br />South Central <br />1701 South 24th Avenue <br />Yakima, WA 98902-5720 <br />(509)575-2740 <br />111603-1 <br />N/A <br />PERMITTEE II AUTHORIZED AGENT OR CONTRACTOR <br />Cie Elum Pines East LLC <br />ATTENTION: Pat Deneen <br />P.O. Box 808 <br />Cie Elum, WA 98926 <br />509-260-0462 <br />Kittitas Conservation Trust <br />ATTENTION: David Gerth <br />205 Alaska Ave. <br />Roslyn, WA 98941 <br />509-649-2951 <br />Fax: 509-649-2867 <br />Project Name: Currier Creek Deneen Diversions (5) Removal <br />Project Description: Remove five former irrigation diversions in order to provide fish passage and <br />restoration of stream processes and riparian function on Currier Creek. The <br />work will proceed from the upstream barrier to the downstream barrier. Site <br />#2 will have 2 grade control structures installed to aid in providing fish <br />passage. Disturbed areas will be revegetated, and slopes graded to match <br />natural slope gradients. <br />PROVISIONS <br />1. TIMING LIMITATIONS: The project may begin January 1, 2008 and shall be completed by <br />August 31, 2008. <br />NOTIFICATION REQUIREMENT <br />2. The permittee or contractor shall notify the Department field office at least 7 days prior to starting <br />the in -stream work portion of this project. Leave message for Habitat Biologist William Meyer: <br />phone (509) 925-2491 or FAX (509) 925-4702. The notification is necessary in order to schedule <br />fish salvage crews and review the site plan prior to construction. The notification shall include the <br />permittee's name, project location, starting date for work, and the control number for this Hydraulic <br />Project Approval. <br />GENERAL <br />3. Work shall be accomplished per plans and information submitted to Washington Department of <br />Fish and Wildlife with Hydraulic Project application and attached typical installation drawings, <br />except as modified by this Approval. A copy of these plans shall be available on-site during <br />construction. <br />4. The contractors shall meet with WDFW on site, prior to removal of the old diversions, to field <br />review site plans and de -construction plans prior to initiating the project. <br />5. The contractor shall prepare a brief Erosion Sediment Control Plan detailing the cofferdam <br />method, and other sediment control measures that will be used to prevent soil from being carried <br />into surface waters. The erosion control measures must be in place prior to any excavation or <br />grading work. <br />6. WDFW or YN Biologists shall conduct a redd survey beginning at least '/z mile downstream of the <br />Page 1 of 8 <br />