My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DA-15-00001 Palomino Fields Master File
>
Meetings
>
2016
>
05. May
>
2016-05-17 2:00 PM - 2:00pm Public Hearing
>
DA-15-00001 Palomino Fields Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2018 9:15:14 AM
Creation date
4/7/2018 10:52:04 AM
Metadata
Fields
Template:
Meeting
Date
5/17/2016
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to Consider a Proposed Development Agreement to Allow Preliminary Plat, Palomino Fields, to Receive Final Plat Review in Five Separate Phases.
Order
1
Placement
2:00pm Public Hearing
Row ID
29616
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
State of Washington <br />DEPARTMENT OF FISH AND WILDLIFE <br />South Central Region • Ellensburg District Office • 201 N. Pearl St, Ellensburg, WA 98926 <br />Telephone: (509) 962-3421 • Fax: (509) 575-2474 <br /> <br />April 28, 2016 <br /> <br />Robert “Doc” Hansen, Director <br />Kittitas County Community Development Services <br />411 N. Ruby Street; Suite 2 <br />Ellensburg, WA 98926 <br /> <br />SUBJECT: Palomino Fields Development Agreement (P-07-31) surrounding Currier Creek – Proposal to <br />Construct in Five Phases <br /> <br />Dear Mr. Hansen, <br /> <br />Thank you for the opportunity to review this proposal and provide comments. The Washington Department of <br />Fish and Wildlife (WDFW) has reviewed the 2008 application materials associated with this proposal on your <br />website, the phasing plan provided to us upon request in April 2016, and we are familiar with the property. <br /> <br />WDFW has worked with this landowner and several others downstream in the Reecer/Currier Watershed to <br />improve fish habitat and restore fish passage. With cooperation of this landowner and others, we now have <br />coho salmon and steelhead spawning and rearing in the watershed and juvenile spring chinook rear in the <br />system as well. We are unaware of any fish passage barriers between this site and the Yakima River for Currier <br />and Reecer Creeks. <br /> <br />The 2008 SEPA mentions a stream habitat enhancement plan through this reach; we welcome the idea of <br />implementing the project (or a similar project) for which 50% designs currently exist to improve instream <br />habitat through this reach. These types of projects are most easily implemented prior to development and if the <br />riparian buffer is in shared open space, rather than multiple private owners. WDFW is interested in exploring <br />the potential to further improve habitat in Currier Creek on this property with the owners. <br /> <br />We encourage the applicants to work with WDFW as early as possible to make plans for the stream crossings <br />over Currier Creek on Bender/Road E and Bowers Roads. These stream crossings, any trail crossings, and any <br />other work that will impact the bed or flow of Currier Creek will require a Hydraulic Project Approval from <br />WDFW. The Hearing Examiners findings note that concurrence from WDFW is a requirement for final plat <br />approval. <br /> <br />We do not have detailed phasing plans for this project, but our interest is in ensuring the fish and wildlife <br />habitat associated with Currier Creek is incorporated into the planning/phasing and that the creek, its buffer, and <br />the floodplain are protected to the greatest extent possible. As such, we have the following recommendations <br />for inclusion in Phase 1 to protect fish and wildlife habitat: <br /> <br /> All utilities, including septic plans, should be properly laid out and planned in Phase 1. <br /> The four wetlands referred to in the 2008 Hearing Examiner’s findings should be clearly identified on <br />the plans along with their buffers to ensure their protection.
The URL can be used to link to this page
Your browser does not support the video tag.