Laserfiche WebLink
a. tfihen the effluent volume reaches a monthly average ul 6' 000 gallons per day the <br />applicant will he required to .start the planting process for this facility. :1;u additional <br />building permits to ill be issued until the Washington State Department of Health or the <br />Washington State Department offcologv has confirmed that the planning process for the <br />_iaeilin, has starred. <br />h. When the effluent volume reaches a monthly average of 10, 000 gallons per day the <br />applicant will be required to have completed the planning prucess far• the facility In <br />addition the applicant will be required to start creating engineering and construction <br />draivings for the fiic•ilit>. No additional building permtts ii -ill he issued until the <br />Washington State Department ofllealth or the Washington Slate Department of Ecologt•• <br />has confirmed that the planning process.for the faciliy has been completed and that the <br />applicant has started the engineering and construction' drawings, <br />c. When the effluent volume reaches a monthly average u/ 12, 000 gallons per dal, rhe <br />applicant will be required to have completed the engineering and construction plans for- <br />this facilin;. Aro udrhttonal building permits will be issued until the Washington State <br />Department of Health rir the Washington State Department v/ Eculo`>ni has confirmed that <br />the engineering and construction plans for the./acilin, have been completed. <br />d. When the effluent volume reaches a monthly average of 14.000 gallons per day the <br />applicant will be required to have obtained a building permit for the•/acdiry and to huve <br />started the construction u/'rhe facili4', 'V0 additional building permits tivill be issued until <br />the Kittita.s Counts.• Building Department has confirmed that a building permit for the <br />Jac•ility has been issued and that construction has started. <br />e. lChen the effluent volume reaches a monthly average q05, 000 gallons per day the _ <br />applicant will be required to have completed and have an operational rec•lainied facility. <br />.Vo additional building permits will be issued until the Washinglot State Department of <br />Health or the Washington State Department of F-cology, has confirmed that the facility° is <br />Operational. <br />1. The applicant will record and provide to Community Development Sen�icec the recorded meter <br />readings.1br each Communtrv, Septic System or Largc On Site Septic Svsrem on u quarterly basis, <br />G, If the applicant wishes to access city systems int the future, it will be rccommended that all <br />improvements be developed to current city standards, <br />H. Metenng shall be required on all residential well connections and metering results shall be recorded <br />in a manner consistent with K.ittitas County and Washington State Department of Ecology <br />requirements (Memorandum of Agreement between Kinitas County and Washington State), <br />1. Me approval of this division of land includes no guarantee that there is a legal right to withdraw <br />groundwater within the land division. The approval of this division of land provides no guarantee <br />that use of water under the ground water exemption (RCW 90.44.050) for this plat or any portion <br />thereof will not be subject to curtailment by the Department of Ecology or a court of law. <br />J. Wastungton Administrative Code (WAC) 173-150 provides for the protection of existing right,. <br />against impairment, i.e. interruption or interference in the availability of water. If the water supply in <br />your arca becomes limited you, use could be curtailed by those with senior water rights. <br />V. Historic and Cultural Preservation <br />;. P1,101M any ground breaking activity on the subject property, the applicant shall consult with the <br />