My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DA-15-00001 Palomino Fields Master File
>
Meetings
>
2016
>
05. May
>
2016-05-17 2:00 PM - 2:00pm Public Hearing
>
DA-15-00001 Palomino Fields Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2018 9:15:14 AM
Creation date
4/7/2018 10:52:04 AM
Metadata
Fields
Template:
Meeting
Date
5/17/2016
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to Consider a Proposed Development Agreement to Allow Preliminary Plat, Palomino Fields, to Receive Final Plat Review in Five Separate Phases.
Order
1
Placement
2:00pm Public Hearing
Row ID
29616
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Figure 4: Willow clumps installed on Irving Creek, a tributary of Medicine Lodge Creek, about 25 miles West of <br />Dubois, ID <br />Corral Creek, ID <br />Corral Creek, near Fairfield, Idaho in Camas County is a small stream that had major bank erosion. The landowner <br />wanted to restore the willow community and protect adjacent grazing lands. A large willow community was located <br />close to the project site and willow clumps were harvested and brought to the site where the backhoe placed the <br />clump into the bank by pushing the soil out of the hole with the bottom of the backhoe bucket and then dropping the <br />clump straight into the hole. Sod mats from adjacent locations were then placed above the willow clumps to the top <br />of the bank. This was the first willow clump planting project by NRCS in the state of Idaho— installed in 1985. <br />Figure 5: Willow clump planting with sod mats on a streambank of Corral Creek near Fairfield, Camas County, ID <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.