My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res to approve Change Order No 11 Teanaway Paving Project
>
Meetings
>
2016
>
01. January
>
2016-01-05 10:00 AM - Commissioners' Agenda
>
Res to approve Change Order No 11 Teanaway Paving Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2018 9:52:31 AM
Creation date
4/7/2018 9:52:12 AM
Metadata
Fields
Template:
Meeting
Date
1/5/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
n
Item
Request to Approve a Resolution and Change Order No. 11 for the Teanaway Road Paving Project
Order
14
Placement
Consent Agenda
Row ID
27208
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S� CPSCPDLS... TO 7yt,cOC .L, <br />p0� G'tl <br />9 <br />KIRITAS COUNTY <br />KZTTZTAiS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />Mark Cook, Director <br />CHANGE ORDER JUSTIFICATION & COST ANALYSIS <br />Date: January 5, 2016 Change Order #11 <br />Project Name: Teanaway Paving Project <br />Project Number. RC 1560-B1 <br />Prepared by. Roy Chance, Construction Manager <br />Justification: <br />A significant amount of Hot Mix Asphalt was needed to pre -level the roadway and achieve the <br />design cross slope throughout the entire length of the project. The existing roadway crown was <br />"rounded" and did not support the design cross-section. The additional amount of hot mix <br />asphalt re-establishing roadway crown was not anticipated during final engineering plan <br />preparation. <br />Quantity over runs in beam guard rail, posts, non -flared terminals, anchors, labor and traffic <br />control were also experienced when guardrail sections were added, or field adjusted due tosite <br />conditions not anticipated during final plan preparation. <br />Cost analysis: <br />The contractor offered extensions of unit costs on all material over runs, which was deemed <br />reasonable by Public Works. The unit costs are the same as those submitted by the contractor <br />in the original bid as awarded by the Board of County Commissioners. <br />411 N. Ruby St., Suite #1 TEL (509) 962-7523 <br />Ellensburg, WA 98926 FAX (509) 962-7663 <br />
The URL can be used to link to this page
Your browser does not support the video tag.