Laserfiche WebLink
�p""p s... TO fbf.0 <br />�E OCL <br />MMTAS COUR"fY <br />KZTTZTAtS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />Mark Cook, Director <br />CHANGE ORDER JUSTIFICATION & COST ANALYSIS <br />Date: January 5, 2016 Change Order #11 <br />Project Name: Teanaway Paving Project <br />Project Number: RC 1560-B1 <br />Prepared by: Roy Chance, Construction Manager <br />Justification: <br />A significant amount of Hot Mix Asphalt was needed to pre -level the roadway and achieve the <br />design cross slope throughout the entire length of the project. <br />Quantity over runs in beam guard rail, posts, non -flared terminals, anchors, labor and traffic <br />control were also experienced when guardrail sections were added due to previously <br />unanticipated steep side conditions. <br />Cost analysis: <br />The contractor offered extensions of unit costs on all material over runs, which was deemed <br />reasonable by Public Works. <br />411 N. Ruby St., Suite #1 TEL (509) 962-7523 <br />Ellensburg, WA 98926 FAX (509) 962-7663 <br />