Laserfiche WebLink
AGREEMENT GCB 2170 <br />EXHIBIT "B" COST ESTIMATE <br />Design and Construct Park and Ride Lot <br />Project: 1.90 Exit 78 Park and Ride Lot <br />NO. <br />DESCRIPTION <br />AMOUNT <br />- Design Phase - <br />1 <br />Environmental documentation, survey, design, plans, <br />specifications and estimate (PS&E) preparation, <br />advertisement, award contract <br />$ 50,500 <br />Design Total <br />$ 50,500 <br />- Construction Phase - <br />2 <br />Construct by Contract: clear, grade, drain, fence, <br />surface, pave HMA, stripe, curb, sign, illumumination <br />storm water mitigation and appurtenances. <br />$ 110,577 <br />3 <br />Wa St Sales Tax Amount on State RNV) = <br />$ 110,577 <br />8.0% <br />$ 8,846 <br />Contract Subtotal <br />$ 119,423 <br />4 <br />Construction Engineering & Administration <br />$ 43,800 <br />5 <br />Contract Contingencies 4% <br />$ 4,777 <br />6 <br />Pavement Repair & Seeding by State Forces <br />$ 4,500 <br />Construction Total <br />$ 172,500 <br />Total Agreement Amount <br />$ 223,000 <br />Notes: Maximum amount available for this Project is $223,000 <br />Appurtenances may include but are not limited to: <br />Charging station and information center <br />Appurtenances may be added per Agreement Section 4. <br />'Contract Change' after bid award, when remaining funds <br />can be determined. <br />Contract Contingency funds may be utilized when <br />approaching the end of the contract work. <br />Agreement GCB 1725 Exhibit A - Cost Estimate Sheet 1 of 1 <br />