My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res to approve an Interlocal with WSDOT Park and Ride
>
Meetings
>
2016
>
01. January
>
2016-01-05 10:00 AM - Commissioners' Agenda
>
Res to approve an Interlocal with WSDOT Park and Ride
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2018 9:52:27 AM
Creation date
4/7/2018 9:51:28 AM
Metadata
Fields
Template:
Meeting
Date
1/5/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
l
Item
Request to Approve a Resolution Authorizing an Interlocal Agreement with Washington State Department of Transportation for a Park and Ride Facility at Exit 78 on I-90
Order
12
Placement
Consent Agenda
Row ID
27208
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGREEMENT GCB 2170 <br />EXHIBIT "B" COST ESTIMATE <br />Design and Construct Park and Ride Lot <br />Project: 1.90 Exit 78 Park and Ride Lot <br />NO. <br />DESCRIPTION <br />AMOUNT <br />- Design Phase - <br />1 <br />Environmental documentation, survey, design, plans, <br />specifications and estimate (PS&E) preparation, <br />advertisement, award contract <br />$ 50,500 <br />Design Total <br />$ 50,500 <br />- Construction Phase - <br />2 <br />Construct by Contract: clear, grade, drain, fence, <br />surface, pave HMA, stripe, curb, sign, illumumination <br />storm water mitigation and appurtenances. <br />$ 110,577 <br />3 <br />Wa St Sales Tax Amount on State RNV) = <br />$ 110,577 <br />8.0% <br />$ 8,846 <br />Contract Subtotal <br />$ 119,423 <br />4 <br />Construction Engineering & Administration <br />$ 43,800 <br />5 <br />Contract Contingencies 4% <br />$ 4,777 <br />6 <br />Pavement Repair & Seeding by State Forces <br />$ 4,500 <br />Construction Total <br />$ 172,500 <br />Total Agreement Amount <br />$ 223,000 <br />Notes: Maximum amount available for this Project is $223,000 <br />Appurtenances may include but are not limited to: <br />Charging station and information center <br />Appurtenances may be added per Agreement Section 4. <br />'Contract Change' after bid award, when remaining funds <br />can be determined. <br />Contract Contingency funds may be utilized when <br />approaching the end of the contract work. <br />Agreement GCB 1725 Exhibit A - Cost Estimate Sheet 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.