My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res to approve task assignment 26 for Westside Road
>
Meetings
>
2013
>
09. September
>
2013-09-17 10:00 AM - Commissioners' Agenda
>
Res to approve task assignment 26 for Westside Road
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2018 11:48:33 PM
Creation date
4/6/2018 11:47:56 PM
Metadata
Fields
Template:
Meeting
Date
9/17/2013
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
g
Item
Request to Approve a Resolution Authorizing Signature for a Professional Engineering Task Order for the Westside Road Project and Terminate the Existing Task Assignment Dated July 17, 2013
Order
7
Placement
Consent Agenda
Row ID
10523
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Westside Road Improvements <br />Scope of Work <br />Kittitas County would like to improve Westside Road from mile post 1.98 to mile post 5.81. The <br />improvements will include: widening the road, improving shoulder slopes, improving guardrails, beveling <br />culverts, and improving sight distance at intersections. Sargent Engineers has been asked to complete the <br />environmental documentation, complete the geotechnical study, and develop the plans, specifications, and <br />estimate for the project. This project was previously started under a different task order. In order to do this, <br />Sargent Engineers will perform the following tasks: <br />Land Survey <br />Additional survey will be performed at the west end of the project. This survey will be sufficient to add <br />approach rails to the bridge that crosses the Hiline canal. This will be added to the base map that has <br />already been prepared for the project. <br />Hydraulic Analysis <br />There is only one stream that crosses Westside Road and that culvert is not to be disturbed. So there will <br />not be any hydraulic analysis for this project. <br />Drainage Design <br />Improved drainage is not part of the prospectus for the project. Therefore, the natural drainage will be <br />preserved and enhanced, but no treatment, detention, or retention of the stormwater is planned. A formal <br />drainage analysis will not be performed. <br />Geotechnical Study <br />PanGEO will perform all geotechnical engineering for the project. PanGEO will need to provide site <br />specific recommendations for cut and fill slopes that are steeper than typical standards, and they will need <br />to provide design recommendations for gravity (ecology) block walls and soldier piles walls at other <br />locations where steepened slopes are not feasible. <br />Geotechnical Engineering Analyses <br />Geotechnical recommendations for design of the roadway widening will be developed in general <br />accordance with load and resistance factor design (i.e., AASHTO LRFD Bridge Design Specifications, 2nd <br />Edition, with Interims and the current WSDOT Bridge Design Manual). The analyses will include: <br />Widening Alternatives Analysis — Considering the roadway geometry and underlying soil and groundwater <br />conditions, they will develop schematic widening support options for the County road that will include <br />cantilever soldier pile walls, gravity (ecology block) walls, and cut and fill slopes. Because of the right of <br />way constraints, they will conduct a site reconnaissance to assess the feasibility of using steeper than <br />normal cut slopes at different locations along the alignment to remain within the right of way and avoid the <br />use of walls. They will prepare sketches of these options for review and concurrence before developing <br />specific design recommendations for viable alternatives. <br />Wall Design Recommendations - Pending concurrence on feasible alternatives for the roadway widening, <br />they will develop recommendation for the embankment support including: <br />0 Cut and Fill Slopes <br />
The URL can be used to link to this page
Your browser does not support the video tag.