Laserfiche WebLink
Consultant Fee Determination <br />Project: Westside Road <br />Principal <br />Senior <br />Senior Project <br />Engineer Engineer <br />Project <br />Engineer <br />Design <br />Engineer <br />Drafter 11 <br />Cledcal Task Cost <br />Rate: $154.00 <br />$120.00 $109.00 <br />$106.00 <br />$85.00 <br />$82.W <br />$61.00 <br />Project Mana ement <br />8 <br />60% Documents <br />Attend 1 meetin s <br />7 <br />Perform final roadwa design <br />Prepare cover sheet <br />80 <br />1 <br />8Mi <br />Pre are quantities sheets <br />1 <br />8 <br />Prepare. roadwa plans (42 sheets) <br />42 <br />84Pre <br />are roadwa cross-sections and details (5 sheets) <br />20 <br />100 <br />Prepare erosion control plans (42 sheets <br />21 <br />84 <br />$8,673 <br />Prepare signing and striping plan (42 sheets) <br />10 <br />84 <br />$7,738 <br />Prepare final retainin wall design <br />40 <br />$3,400 <br />Prepare retaining wall layout <br />8 <br />60 <br />$5,600 <br />Prepare retaining wall details <br />2 <br />16 <br />$1482 <br />Prepare bridge rail retrofit <br />16 <br />$1,360 <br />Prepare bridge rail details <br />4 <br />16 <br />$1,652 <br />Prepare special rovisions <br />32 <br />$2,720 <br />Prepare quantities <br />16 <br />$1,360 <br />Prepare cost estimate <br />4 <br />$340 <br />90% Documents <br />Attend 1 meetings <br />7 <br />$1,078 <br />Check final roadway design <br />Check coversheet <br />40 <br />0.5 <br />4 <br />$4,240 <br />$381 <br />Check quantifies sheets <br />0.5 <br />4 <br />$381 <br />Check roadwa plan and rofiles <br />21 <br />42 <br />$5,670 <br />Check roadwa cross-sections <br />10 <br />50 <br />$5,160 <br />Check erosion control lans <br />10.5 <br />42 <br />1 $4,557 <br />Check signin and stripin lans <br />5 <br />42 <br />$3,974 <br />Check retaining wall design <br />20 <br />$2,120 <br />Check retainin wall Is out <br />4 <br />30 <br />$2,884 <br />Check relainin wall details <br />1 <br />8 <br />$762 <br />Check brill arail retrofit <br />8 <br />$848 <br />Check brid arail details <br />2 <br />8 <br />$868 <br />Checks ecial provisions <br />16 <br />$1,fi96 <br />Check quantities <br />16 <br />$1,696 <br />Check cost estimate <br />4 <br />$424 <br />Plans, Specifications and Estimate <br />Make chan es to plans, s ec'rfications and estimate <br />16 <br />40 <br />40 <br />40 <br />$13,384 <br />Produce bid document originals <br />16 <br />8 <br />16 <br />$3,688 <br />Total Direct Salary Cost <br />38 <br />0 0 <br />214.5 <br />345 <br />746 <br />0 $179,086 <br />Direct Costs <br />Milea a <br />$354.82 <br />Complete Geotechnical Study <br />$29,897.00 <br />Complete Environmental Permitting <br />$9,551.50 <br />Additional Survey at West End of Project <br />$3,000.00 <br />Total Direct Casts <br />$42,803 <br />Total <br />$161,889 <br />