My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Part 1 BOCC_Marion PBCP record
>
Meetings
>
2009
>
10. October
>
2009-10-06 10:00 AM - Commissioner's Agenda Session
>
Part 1 BOCC_Marion PBCP record
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2018 1:23:33 PM
Creation date
4/6/2018 1:16:41 PM
Metadata
Fields
Template:
Meeting
Date
10/6/2009
Meeting title
Commissioner's Agenda Session
Location
Commissioner's Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Continued Closed Record Meeting to Consider the Marion Performance Based Cluster Plat (P-06-06)
Order
1
Placement
2
Row ID
9194
Type
15
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 Introduction <br />This report outlines findings of a traffic impact analysis performed for proposed residential <br />development projects on Nelson Siding Road in Kittitas County, Washington. These <br />projects are located near the City of Cle Bum, just south of Interstate 90. <br />This analysis is formatted to document the transportation -related impacts of the proposed <br />projects. This includes developing vehicle trip generation rates for the projects and analyzing <br />the impacts of these trips on the local road network in terms of intersection level of service <br />and site access. This study also documents existing road conditions, planned improvements <br />and other significant projects in the vicinity. A vicinity map is included as Figure 1. <br />Preliminary design considerations and recommendations to mitigate traffic impacts are <br />included in this report. <br />2 Project Description <br />Terra Design Group is proposing two residential developments south of Nelson Siding Road in <br />Kittitas County, Washington. The MarionSpringtree developments consists of the Marion cluster, <br />an 18 acre site with 12 single-family homes, and the Springtree cluster, with 6 single-family homes <br />on 9 acres. Both developments will be built around a single road accessing Nelson Siding Road to <br />the north and ending in a cul-de-sac at the south end of the developments. The Marion cluster will <br />have an additional 20' access easement along the east side of the development to service two of its <br />lots. The layout of these developments is included as Figure 2. <br />3 Existing Conditions <br />Existing conditions evaluated at the project site include the road network, current traffic <br />volumes and patterns, and the collision history at locations near the site. Existing land uses <br />and the associated traffic generated by these uses were also considered. <br />3.1 Existing Road Network <br />The following roads are in the vicinity of the project sites: <br />• I-90: Interstate 90 is the major east/west freeway <br />through this part of Washington, and is located <br />approximately half a mile north of these project sites. <br />Exits 74 and 78 would serve these sites by way of <br />Nelson Siding Road. <br />MarionSpringtree Developments 2 June 2007 <br />Transportation Impact Analysis <br />'. X h s � A <br />000100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.