My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Part 1 BOCC_Marion PBCP record
>
Meetings
>
2009
>
10. October
>
2009-10-06 10:00 AM - Commissioner's Agenda Session
>
Part 1 BOCC_Marion PBCP record
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2018 1:23:33 PM
Creation date
4/6/2018 1:16:41 PM
Metadata
Fields
Template:
Meeting
Date
10/6/2009
Meeting title
Commissioner's Agenda Session
Location
Commissioner's Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Continued Closed Record Meeting to Consider the Marion Performance Based Cluster Plat (P-06-06)
Order
1
Placement
2
Row ID
9194
Type
15
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br />1 INTRODUCTION.............................................................................................2 <br />2 PROJECT DESCRIPTION................................................................................2 <br />3 EXISTING CONDITIONS................................................................................2 <br />3.1 EXISTING ROAD NETWORK............................................................................................ <br />2 <br />- 3.2 EXIsTQVG 77?AFF/C VOLUMES......................................................................................... <br />3 <br />3.3 EXISTWG TRfP GENERATIoN.......................................................................................... <br />3 <br />3.4 EXIsTWG LwERSEo7oN OPERATIONs........................................................................... <br />3 <br />- 3.5 CocusloN FLsroRr..................................................................................................... <br />4 <br />4 PROJECT TRIP GENERATION AND DISTRIBUTION.....................................8 <br />- 4.1 TRIP GENERATION........................................................................................................ <br />8 <br />4.2 77uP D/sTRB( nm AND AssIGNmF-w............................................................................ <br />8 <br />5 FUTURE CONDITIONS WITH PROJECT......................................................10 <br />6 PRELIMINARY DESIGN GUIDELINES..........................................................12 <br />_ 6.1 NEW ROADWAYS......................................................................................................... <br />12 <br />6.2 EXISTING ROADWAYS.................................................................................................. <br />12 <br />7 CONCLUSIONS............................................................................................13 <br />APPENDIX A: PM PEAK HOUR TRAFFIC VOLUMES <br />— APPENDIX B: PM PEAK HOUR TRAFFIC VOLUMES WORKSHEETS <br />APPENDIX C: LEVEL OF SERVICE WORKSHEETS <br />Marion-Springtree Developments June 2007 <br />Transportation Impact Analysis <br />00103 <br />
The URL can be used to link to this page
Your browser does not support the video tag.