My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SH16-044 FFY16 HSGP - E17-075 Kittitas County-signed
>
Meetings
>
2017
>
01. January
>
2017-01-03 10:00 AM - Commissioners' Agenda
>
SH16-044 FFY16 HSGP - E17-075 Kittitas County-signed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2018 3:15:27 PM
Creation date
1/16/2018 1:39:24 PM
Metadata
Fields
Template:
Meeting
Date
1/3/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
i
Item
Request to Acknowledge FFY16 (HSGP) Homeland Security Grant Program #E17-075
Order
9
Placement
Consent Agenda
Row ID
34038
Type
Grant
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
i. No costs for purchases of equipment/supplies will be reimbursed until the related <br />equipment/supplies have been received by the Subrecipient, its contractor, or any non-federal <br />entity to which the Subrecipient makes a subaward, and is invoiced by the vendor. <br />J. Failure to timely submit complete reports and reimbursement requests as required by this <br />Agreement (including, but not limited to, those reports in the Timeline) will prohibit the <br />Subrecipient from being reimbursed until such complete reports and reimbursement requests are <br />submitted and the Department has had reasonable time to conduct its review. Final <br />reimbursement requests will not be approved for payment until the Subrecipient is current with all <br />reporting requirements contained in this Agreement. <br />k. A written amendment will be required if the Subrecipient expects cumulative transfers between <br />project budgets, as identified in the Work Plan (Exhibit C) and Budget (Exhibit E), to exceed 10% <br />of the Grant Agreement Amount. Any adjustments to project totals other than in compliance with <br />this paragraph will not be reimbursed. <br />I. Subrecipients shall only use federal award funds under this Agreement to supplement existing <br />funds, and will not use them to replace (supplant) non-federal funds that have been budgeted for <br />the same purpose. The Subrecipient may be required to demonstrate and document that the <br />reduction in non-federal resources occurred for reasons other than the receipt or expected receipt <br />of federal funds. <br />3. REPORTING REQUIREMENTS <br />a. The Subrecipient shall submit with each reimbursement request a report indicating the status of <br />Work Plan activities for which reimbursement is sought in the format provided by the Department. <br />b. The Subrecipient shall comply with the Federal Funding Accountability and Transparency Act <br />(FFATA) and related OMB Guidance consistent with Public Law 109-282 as amended by section <br />6202(x) of Public Law 110-252 (see 31 U.S.G. 6101 note) and complete and return to the <br />Department the FFATA Form located at htt ://mil.wa. ov/emer enc -mann ement- <br />division/ rants/re uired rantforms; which is incorporated by reference and made a part of this <br />Agreement. <br />c. The Subrecipient shall participate in the State's annual capabilities assessment for the State <br />Preparedness Report, <br />4. EQUIPMENT AND SUPPLY MANAGEMENT <br />a. The Subrecipient and any non-federal entity to which the Subrecipient makes a subaward shall <br />comply with 2 CFR 200.318 — 200.326 when procuring any equipment or supplies under this <br />Agreement, 2 CFR 200.313 for management of equipment, and 2 CFR 200.314 for management <br />of supplies, to include, but not limited to; <br />i. Upon successful completion of the terms of this Agreement, all equipment and supplies <br />purchased through this Agreement will be owned by the Subrecipient, or a recognized non- <br />federal entity to which the Subrecipient has made a subaward, for which a contract, <br />subrecipient grant agreement, or other means of legal transfer of ownership is in place. <br />ii. All equipment, and supplies as applicable, purchased under this Agreement will be recorded <br />and maintained in the Subrecipient's inventory system. <br />iii. Records shall include: a description of the property; the manufacturer's serial number, model <br />number, or other identification number; the source of funding for the equipment, including <br />the Federal Award Identification Number (FAIN); Catalog of Federal Domestic Assistance <br />(CFDA) number; who holds the title; the acquisition date; the cost of the equipment and the <br />percentage of Federal participation in the cost; the location, use and condition of the <br />equipment at the date the information was reported; and disposition data including the date <br />of disposal and sale price of the property. <br />iv. The Subrecipient shall take a physical inventory of the equipment and reconcile the results <br />with the property records at least once every two years. Any differences between quantities <br />determined by the physical inspection and those shown in the records shall be investigated <br />by the Subrecipient to determine the cause of the difference. The Subrecipient shall, in <br />DHS-FEMA-HSCP-SHSP-FFY16 Page 4 of 25 Kittitas, County of, E17-075 <br />
The URL can be used to link to this page
Your browser does not support the video tag.