Laserfiche WebLink
2017 Docket Enabling Ordinance January 2, 2018 <br />Ord. # 2018-001 <br />Page 73 <br /> <br />44. Required to meet all the review criteria requirements for conditional use permits found in KCC 17.60A.015. <br />45. An administrative conditional use permit is required when enhanced agricultural sales or sales of goods <br />produced offsite are provided and/or when the farm stand is located more than forty-five (45) feet from the <br />centerline of the public street or highway. <br />46. When enhanced agricultural sales are provided. <br />47. Pursuant to KCC Chapter 17.62, Public Facilities Permits. <br />48. Limited to primitive campgrounds. <br />49. Agricultural Enhanced Uses which include eating and drinking establishments and/or event facilities for <br />seminars or other social gatherings are limited to 10,000 square feet of total indoor floor area. <br />50. Subject to the following requirements: <br /> a. Manufactured home parks shall require approval of a binding site plan pursuant to KCC Title 16. <br />b. Manufactured home park density shall not to exceed twelve (12) units per acre. A minimum of five <br />(5) manufactured home spaces shall be required per park. <br /> c. Manufactured home parks shall provide not less than ten percent (10%) of the gross area of the park <br />for common open space for the use of its residents. <br /> d. Each manufactured home space shall have direct frontage on a public or private street. <br />e. The minimum setbacks shall be consistent with the zoning classification they are located in. <br /> <br />17.61.040 Communication facilities - Administrative review - General requirements <br />1. Communication facilities may be authorized by the Community Development Services director as an <br />administrative conditional use in all zoning districts, pursuant to the criteria and procedures of this chapter and <br />KCC Title 15A and KCC 17.60. An administrative conditional use permit is not required for the operation of <br />amateur or noncommercial communication equipment as defined by FCC regulations under Part 95D and Part <br />97 CFR (i.e., citizen band, ham radio). <br />2. Construction of all improvements shall be completed within one year of the date of permit issuance except as <br />provided for in subsections E and F of this section. <br />3. The property line setback shall be 1.2 times the height of the structure. The lot line setback requirements of this <br />title may be waived reduced by the Community Development Services director, in order to improve the facilities' <br />reception and/or transmission capabilities or to achieve greater levels of audible or visual screening than that <br />which would be available by using the applicable zone's yard requirements provided the applicant can provide <br />evidence that it would not be possible for the tower to fall on neighboring properties. Communication facilities <br />shall be designed to blend with existing surroundings; provided, no conflicts exist with existing Federal <br />Communications Commission and the Federal Aviation Administration regulations relating to aircraft safety. This <br />should be achieved through the use of compatible colors and materials, and alternative site placement to allow <br />the use of topography, existing vegetation or other structures to screen the proposed transmission support <br />structure from adjacent lands. <br />4. The co-location of antennas on both existing and proposed transmission structures is encouraged. <br />Communication antennas shall be permitted outright in all zoning districts provided the following: <br />a. An antenna shall not extend more than six feet horizontally from any structure to which it is attached. <br />b. An antenna shall not extend vertically more than 15 feet above the uppermost portion of the structure to <br />which it is mounted or attached. <br />5. Modifications to, including the expansion of, existing approved communication facilities shall be outright <br />permitted; provided, there is no increase in the height of the transmission tower. For purposes of this subsection, <br />"transmission tower" means a pole or lattice-work structure specifically designed and intended to support