My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ResolutiontoApproveChairSignatureFHWATeanawayHydraulics
>
Meetings
>
2017
>
08. August
>
2017-08-15 10:00 AM - Commissioners' Agenda
>
ResolutiontoApproveChairSignatureFHWATeanawayHydraulics
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2018 3:11:49 PM
Creation date
1/16/2018 12:17:25 PM
Metadata
Fields
Template:
Meeting
Date
8/15/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
m
Item
Request to Approve a Resolution Authorizing the Chair's Signature on the Interagency Agreement with the Federal Highway Administration Authorizing the Reimbursement of Funds to Kittitas County Public Works for the Teanaway Hydraulic Improvement Project
Order
13
Placement
Consent Agenda
Row ID
38819
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Statement of Work for Reimbursable Agreement <br />WA Kittitas (1), Teanaway Road Hydraulics Improvements <br />I. INTRODUCTION (project work summary and location) <br />The proposed project is along Teanaway Road at approximate Milepost (MP) 6.90 and at <br />approximate MP 8.64 with approximate coordinates 47.25480, -120.8754 and 47.27587, - <br />120.8821 respectively. <br />Objectives of the project <br />• To improve storm water drainage, fish passage, and clean water passage <br />• To reduce pavement damage during high water and roadway maintenance cost <br />• To improve safety through the section by providing a facility that safely accommodates <br />vehicular traffic and bike/pedestrian for locals and visitors <br />• To reduce possible roadway closure during high water runoff and overtopping <br />SCOPE <br />• Remove existing undersized culverts and replace with the following (both locations are fish <br />bearing stream and having roadside stability issues): <br />• MP 6.9, Story Creek — Remove 9'x 3' concrete box culvert. Install 19'W x ]0'H x 60'L <br />concrete box culvert or appropriate structure as identified throughout the design; <br />• MP 8.64, Lick Creek (MP 1.36 North Fork Teanaway Road) — Remove 36" Corrugate Metal <br />Pipe (CMP) and 54" Reinforced Concrete Pipe (RCP), and re-route stream channel dependent <br />on hydraulic analysis - Creek is not flowing through the natural downstream channel, which <br />created flooding. Construct a single span 80' long bridge or appropriate structure as identified <br />throughout the design; <br />• Reconstruct roadway, repave, and restripe; <br />• Install guardrail <br />If Right -of -Way and/or easement acquisition is necessary to complete the project, Kittitas <br />County will be responsible for the acquisition. Federal Highway Administration -Western <br />Federal Lands (FHWA-)YFLI will reimburse Kittitas County their portion of the approved and <br />applicable acquisitions costs. <br />If utility relocation is necessary to complete the project, Kittitas County will be responsible for <br />the relocation. Any applicable reimbursement to the utility company will be governed by State <br />law and regulation, or Occupancy Permits in accordance with 23 CFR PART 645.103. FHWA <br />-WFL will reimburse Kittitas County their portion of the approved and applicable relocation <br />costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.