My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ResolutiontoApproveChairSignatureTOJacobsManastash
>
Meetings
>
2017
>
08. August
>
2017-08-15 10:00 AM - Commissioners' Agenda
>
ResolutiontoApproveChairSignatureTOJacobsManastash
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2018 3:11:51 PM
Creation date
1/16/2018 12:15:22 PM
Metadata
Fields
Template:
Meeting
Date
8/15/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
h
Item
Request to Approve a Resolution Authorizing the Chairman's Signature on Formal Task Order Document Number 001 with Jacobs Engineering Group, Inc.
Order
8
Placement
Consent Agenda
Row ID
38819
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
�c,pea... TO <br />Fes''£ �°^�� KZTTZTASi COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />IQIT w COCT?Y <br />Formal 'bask Order Document <br />Jacobs Engineering Group <br />Agreement KCPW2017-19ENG1 <br />Task Order Number 01 <br />Maximum Amount Payable $279,603 Completion Date <br />4/30/18 <br />The general provisions and clauses of Local Agency Agreement Number KCPW2017- <br />19ENG1 shall be in full force and effect for this Task Order. <br />Location of Project: Manastash Road, MP 10.8 <br />Project Title: Manastash Creek Bridge Replacement <br />Description of Work: <br />Jacobs will provide management, engineering, and/or support for civil, structures, hydraulics, <br />right-of-way, permitting, documentation, and environmental construction services for the <br />Manastash Creek Bridge Replacement Project. See attached scope for more detail of each Task. <br />Task 01 - Project Management: This task includes project controls and administrative tasks <br />related to project start-up, safety planning, invoicing, quality reviews, and project close-out for a <br />period of 9 months. <br />Task 02 — Data Analysis: This task includes review and coordination of existing County - <br />provided data, survey, studies, reports, maps, etc. associated with the project area. <br />Task 03 — Geotechnical Field Investigation: This task includes mobilization, drilling, and soil <br />lab tests performed on two (2) bore holes from the project site. <br />Task 04 — Geotechnical Engineering Analysis and Report: This task includes engineering <br />analysis of the data provided from Task 03 and one (1) geotechnical report provided to the <br />County. <br />Task 05 — NEPA/SEPA Documentation: This task covers communication and coordination with <br />regulatory and resource agencies, permit submittals, follow-up needs, completion of reporting <br />requirements, and environmental support during construction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.