My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ResolutiontoApproveTaskOrder8KPFF
>
Meetings
>
2017
>
07. July
>
2017-07-18 10:00 AM - Commissioners' Agenda
>
ResolutiontoApproveTaskOrder8KPFF
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2018 3:12:12 PM
Creation date
1/16/2018 12:07:41 PM
Metadata
Fields
Template:
Meeting
Date
7/18/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
o
Item
Request to Approve a Resolution Authorizing the Chairman's Signature on Formal Task Order Document Number 008 with KPFF Consulting Engineers
Order
15
Placement
Consent Agenda
Row ID
38280
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Kinins County CONSULTANT LINE ITEM COST ESTIMATE WORK SHEET <br />On -call -20$] <br />Task Order <br />CONSULTANT FEE DETERMINATION BY KPFF FOR KITTITAS COUNTY ON CALL <br />ROAD 6 BRIDGE PSBE <br />ESTIMATION OF MANAGEMENT AND ENGINEERING HOURS <br />COST <br />TASK ORDER8 <br />vnnc Dave <br />w( <br />MOMullen) <br />Project <br />Man ager <br />ITom <br />Whiversho <br />Teahnkal <br />6wdalm <br />(Tam <br />Whose n) <br />semar <br />Erglneer <br />(9lrvho 4 <br />CNi) <br />Daagn <br />Engineer <br />(91ructurN8 <br />CM) <br />caD Tenn <br />(so-uclural$04minelrarer <br />CNII) <br />wojeM <br />IA <br />Femoro.) <br />MLLTPLIER'. <br />REM SCOPE OF WORK <br />$62.50 <br />$6923 <br />$6923 <br />$4240 <br />$35.16 <br />$3900 <br />$26,48 <br />26552 <br />t CONTRACT MANAGEMENT AND COORDINATION <br />cont.ct compliance a On,l Mbn <br />16 <br />2 <br />2 <br />$757 <br />Client Communiwipns <br />8 <br />$1471 <br />Ia6 <br />SFIlsr&General Projev1 Coordinahon <br />18 <br />4 <br />$3,590 <br />SUMnnswei nl Coordination <br />0 <br />Inwicing B Project Summaries <br />1.5 <br />6 <br />8 <br />51.914 <br />Labor Subtobl l: <br />3 <br />34 <br />0 <br />0 <br />0 <br />0 <br />14 <br />$1.732 <br />So <br />2 SITE OR CLIENT VISIT Iu a[v.Esrsowaaawot <br />Td.NIE T) <br />4 <br />4 <br />4 <br />$1.559 <br />Prep. Meet WCMY <br />2 <br />4 <br />2 <br />$1005 <br />Lahr Sul 2:1 <br />8 <br />0 <br />8 <br />6 <br />0 <br />0 <br />$2,564 <br />$200 <br />3 DEVELOPMENT OF PSSE- CONTRACT BID DOCUMENTS <br />Sheet 1 -corer <br />1b <br />30 <br />10.0 <br />$1 s57 <br />Sheel2-Gen Notes, OsenNies. space. Cron section <br />40 <br />24.0 <br />8.0 <br />200 <br />$6255 <br />Sheri B- General Plan. Layout B Flair <br />Bo <br />220 <br />80 <br />28.0 <br />$1,226 <br />She. 4- Foundatun. Abatmrm. W. Wane 1 <br />20 <br />4.0 <br />20.0 <br />200 <br />$4,756 <br />Sheet 5- Fourche, ACWmess W Willal <br />20 <br />4.0 <br />16.0 <br />180 <br />54,176 <br />Sheet 6-Fral leg Plan and Gine. 1 <br />3.0 <br />4.0 <br />16.0 <br />20.0 <br />$4,567 <br />Sheet 7- Gore, 2, Orleans. Joint <br />20 <br />4,0 <br />16.0 <br />180 <br />$4.176 <br />Shdrl Approach Slabts) <br />10 <br />20 <br />8.0 <br />18.0 <br />$3,020 <br />Sheer 9- Bridge Ran 8 Gnarl 1 <br />3.0 <br />200 <br />40 <br />20.0 <br />$5,248 <br />Sheol Guartl Ra,128Mec <br />10 <br />120 <br />4.0 <br />180 <br />$3712 <br />Plan orad Calculatun OulaAy LaMrol LM1ecb and ReWevrs <br />6.0 <br />80 <br />24.0 <br />40 <br />12.0 <br />$6,]89 <br />Plan Coordinalbn uilh Caunty(Survry, C.I. G..N.Innkal) <br />60 <br />100 <br />20 <br />40 <br />$2,830 <br />LoaU Rating <br />20 <br />20.0 <br />40 <br />$2,993 <br />Ciui Engineering (wbw c, Al ,ad. oad.. detour <br />plan, deWatbns. guardrail review, Stripping. TE50, drainage review, <br />ac) <br />80 <br />40.0 <br />40.0 <br />36.0 <br />$13,436 <br />Labor Subbtal 3: <br />6 <br />8 <br />41 <br />193 <br />150 <br />242 <br />0 <br />$70.794 <br />$0 <br />4 COSTRUCTION SUPPORT - dvnexu <br />Consolation, RFI and Shop Rei Questions <br />Did or County Vold <br />1 <br />4 <br />12 <br />12 <br />6 <br />1 <br />$4 064 <br />labor Subtobl4: <br />1 <br />0 <br />4 <br />12 <br />12 <br />6 <br />t <br />$4,064 <br />TOTAL LABOR <br />10 <br />48 <br />45 <br />213 <br />188 <br />246 <br />15 $ <br />86154 <br />TOTAL REIMBURSABLE <br />ii <br />f <br />MANAGEMENT RESERVE (OPTIONAL) <br />I <br />$ <br />A <br />GRAND TOTAL -NOT TO E%CEEB <br />$825 <br />$3,523 <br />$3,115 <br />$9,031 <br />$5,90] <br />$9.672 <br />f3W <br />
The URL can be used to link to this page
Your browser does not support the video tag.