Laserfiche WebLink
Kinins County CONSULTANT LINE ITEM COST ESTIMATE WORK SHEET <br />On -call -20$] <br />Task Order <br />CONSULTANT FEE DETERMINATION BY KPFF FOR KITTITAS COUNTY ON CALL <br />ROAD 6 BRIDGE PSBE <br />ESTIMATION OF MANAGEMENT AND ENGINEERING HOURS <br />COST <br />TASK ORDER8 <br />vnnc Dave <br />w( <br />MOMullen) <br />Project <br />Man ager <br />ITom <br />Whiversho <br />Teahnkal <br />6wdalm <br />(Tam <br />Whose n) <br />semar <br />Erglneer <br />(9lrvho 4 <br />CNi) <br />Daagn <br />Engineer <br />(91ructurN8 <br />CM) <br />caD Tenn <br />(so-uclural$04minelrarer <br />CNII) <br />wojeM <br />IA <br />Femoro.) <br />MLLTPLIER'. <br />REM SCOPE OF WORK <br />$62.50 <br />$6923 <br />$6923 <br />$4240 <br />$35.16 <br />$3900 <br />$26,48 <br />26552 <br />t CONTRACT MANAGEMENT AND COORDINATION <br />cont.ct compliance a On,l Mbn <br />16 <br />2 <br />2 <br />$757 <br />Client Communiwipns <br />8 <br />$1471 <br />Ia6 <br />SFIlsr&General Projev1 Coordinahon <br />18 <br />4 <br />$3,590 <br />SUMnnswei nl Coordination <br />0 <br />Inwicing B Project Summaries <br />1.5 <br />6 <br />8 <br />51.914 <br />Labor Subtobl l: <br />3 <br />34 <br />0 <br />0 <br />0 <br />0 <br />14 <br />$1.732 <br />So <br />2 SITE OR CLIENT VISIT Iu a[v.Esrsowaaawot <br />Td.NIE T) <br />4 <br />4 <br />4 <br />$1.559 <br />Prep. Meet WCMY <br />2 <br />4 <br />2 <br />$1005 <br />Lahr Sul 2:1 <br />8 <br />0 <br />8 <br />6 <br />0 <br />0 <br />$2,564 <br />$200 <br />3 DEVELOPMENT OF PSSE- CONTRACT BID DOCUMENTS <br />Sheet 1 -corer <br />1b <br />30 <br />10.0 <br />$1 s57 <br />Sheel2-Gen Notes, OsenNies. space. Cron section <br />40 <br />24.0 <br />8.0 <br />200 <br />$6255 <br />Sheri B- General Plan. Layout B Flair <br />Bo <br />220 <br />80 <br />28.0 <br />$1,226 <br />She. 4- Foundatun. Abatmrm. W. Wane 1 <br />20 <br />4.0 <br />20.0 <br />200 <br />$4,756 <br />Sheet 5- Fourche, ACWmess W Willal <br />20 <br />4.0 <br />16.0 <br />180 <br />54,176 <br />Sheet 6-Fral leg Plan and Gine. 1 <br />3.0 <br />4.0 <br />16.0 <br />20.0 <br />$4,567 <br />Sheet 7- Gore, 2, Orleans. Joint <br />20 <br />4,0 <br />16.0 <br />180 <br />$4.176 <br />Shdrl Approach Slabts) <br />10 <br />20 <br />8.0 <br />18.0 <br />$3,020 <br />Sheer 9- Bridge Ran 8 Gnarl 1 <br />3.0 <br />200 <br />40 <br />20.0 <br />$5,248 <br />Sheol Guartl Ra,128Mec <br />10 <br />120 <br />4.0 <br />180 <br />$3712 <br />Plan orad Calculatun OulaAy LaMrol LM1ecb and ReWevrs <br />6.0 <br />80 <br />24.0 <br />40 <br />12.0 <br />$6,]89 <br />Plan Coordinalbn uilh Caunty(Survry, C.I. G..N.Innkal) <br />60 <br />100 <br />20 <br />40 <br />$2,830 <br />LoaU Rating <br />20 <br />20.0 <br />40 <br />$2,993 <br />Ciui Engineering (wbw c, Al ,ad. oad.. detour <br />plan, deWatbns. guardrail review, Stripping. TE50, drainage review, <br />ac) <br />80 <br />40.0 <br />40.0 <br />36.0 <br />$13,436 <br />Labor Subbtal 3: <br />6 <br />8 <br />41 <br />193 <br />150 <br />242 <br />0 <br />$70.794 <br />$0 <br />4 COSTRUCTION SUPPORT - dvnexu <br />Consolation, RFI and Shop Rei Questions <br />Did or County Vold <br />1 <br />4 <br />12 <br />12 <br />6 <br />1 <br />$4 064 <br />labor Subtobl4: <br />1 <br />0 <br />4 <br />12 <br />12 <br />6 <br />t <br />$4,064 <br />TOTAL LABOR <br />10 <br />48 <br />45 <br />213 <br />188 <br />246 <br />15 $ <br />86154 <br />TOTAL REIMBURSABLE <br />ii <br />f <br />MANAGEMENT RESERVE (OPTIONAL) <br />I <br />$ <br />A <br />GRAND TOTAL -NOT TO E%CEEB <br />$825 <br />$3,523 <br />$3,115 <br />$9,031 <br />$5,90] <br />$9.672 <br />f3W <br />