My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ResolutiontoApproveTaskOrder8KPFF
>
Meetings
>
2017
>
07. July
>
2017-07-18 10:00 AM - Commissioners' Agenda
>
ResolutiontoApproveTaskOrder8KPFF
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2018 3:12:12 PM
Creation date
1/16/2018 12:07:41 PM
Metadata
Fields
Template:
Meeting
Date
7/18/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
o
Item
Request to Approve a Resolution Authorizing the Chairman's Signature on Formal Task Order Document Number 008 with KPFF Consulting Engineers
Order
15
Placement
Consent Agenda
Row ID
38280
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />AGENDA STAFF REPORT <br />AGENDA DATE: July 18th, 2017 <br />ACTION REQUESTED: Approve the Chairman's Signature on Formal Task Order <br />Document Number 008 with KPFF Consulting Engineers <br />BACKGROUND: Public Works was awarded Rural Arterial Program (RAP) <br />funds from the County Road Administration Board <br />(CRAB) for the replacement of the No. 6 Road Bridge in <br />2013. <br />The bridge replacement project over Town Ditch was <br />awarded $684,900 of RAP funds. The bridge was built in <br />1955 and rebuilt in 1963 and at the time of the grant <br />application the bridge had a poor sufficiency rating of <br />27.82. Additionally the bridge is approximately four feet <br />narrower then the road approach on either side. <br />The cost for engineering services has been negotiated with <br />KPFF Consulting Engineers for the structural design of the <br />replacement. Public Works is in agreement that a not to <br />exceed $87,500.00 is a fair cost for delivery and will keep <br />the project at budget. <br />Currently the schedule for deliver indicates design will be <br />completed March 2018 with advertisement and award for <br />construction commencing May 2018. It is anticipated that <br />construction for the replacement bridge will occur Fall <br />2018 through Spring 2019. <br />INTERACTION: Public Works <br />RECOMMENDATION: Move to approve the Chairman's Signature on Formal Task <br />Order Document Number 008 with KPFF Consulting <br />Engineers <br />HANDLING: Return one (1) copy to Public Works <br />ATTACHMENTS: Formal Task Order Document Number 008 <br />LEAD STAFF: Lucas Huck, County Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.