Laserfiche WebLink
  <br />N:\Finance\Rate Schedules\2017\2017 Billing Rate Schedule May 2017.docx  <br />SCJ Alliance  <br />Billing Rate Schedule  ‐  May 2017  <br />Classification Hourly Billing Rate  <br />Senior Principal Consultant  $250.00 ‐ $295.00  <br />Principal $175.00 ‐ $245.00  <br />Principal Environmental Scientist  $140.00 ‐ $180.00  <br />Principal Landscape Architect  $140.00 ‐ $175.00  <br />Senior Consultant $180.00 ‐ $225.00  <br />Senior Project Manager $142.00 ‐ $205.00  <br />Project Manager $130.00 ‐ $155.00  <br />Project Engineer II $125.00 ‐ $140.00  <br />Project Engineer I $115.00 ‐ $130.00  <br />Senior Designer $110.00 ‐ $125.00  <br />Design Engineer $90.00 ‐ $115.00  <br />Project Landscape Architect  $105.00 ‐ $130.00  <br />Landscape Architect I $100.00 ‐ $115.00  <br />Landscape Designer $80.00 ‐ $100.00  <br />Senior Planner $125.00 ‐ $145.00  <br />Planner $95.00 ‐ $120.00  <br />Environmental Scientist $135.00 ‐ $160.00  <br />Environmental Planner $105.00 ‐ $120.00  <br />Senior Transportation Planner  $140.00 ‐ $160.00  <br />Transportation Planner $110.00 ‐ $125.00  <br />Traffic Analyst $95.00 ‐ $115.00  <br />Designer                 $95.00 ‐ $110.00  <br />Graphic Designer                $95.00 ‐ $125.00  <br />Project Coordinator II $95.00 ‐ $110.00  <br />Project Coordinator I $75.00 ‐ $90.00  <br />Project Accountant $95.00 ‐ $145.00  <br />Administrative Assistant $70.00 ‐ $85.00  <br />Information Technology Specialist  $80.00 ‐ $165.00  <br />Communications Director $100.00 ‐ $130.00  <br />Other Fees:  <br /> Direct project expenses and reproduction costs are billed at cost plus 15%  <br />  <br />  <br />Reimbursable Expenses:  <br /> Mileage  <br /> Bond Paper Plots  <br /> Mylar  <br /> Reports  <br />  <br />$0.65/Mile  <br />$2.50/Sheet  <br />$20.00/Sheet  <br />$35.00/Each  <br />