Laserfiche WebLink
dinner cee"es <br />dean CONSULTANT LINE ITEM COST ESTIMATE WORK SHEET <br />2ba <br />1..x Order <br />LGA1, DATINGS <br />Average Per 9rltl9e(Rgeer Erg <br />.111 CONSULTING ENGINEERS <br />ENGINEEWNG E6TIMFTEG Hd1N5 <br />NPFF <br />TASK 4 <br />de <br />ut <br />"o <br />E <br />u °r <br />U a <br />V do <br />_ <br />m <br />y <br />b <br />14 o <br />n <br />'u W <br />PrOj¢cl <br />Man..emit . <br />WIIXeman) <br />TecM1mcal <br />Pormal5l(T <br />Anderson) <br />5¢nl0r <br />En9lneer M <br />( <br />Frymoyer) <br />Gesgn <br />E rgineer(A <br />Arms, <br />CAD iecM1 <br />(Saill <br />Pra(eG <br />POmldatrarer <br />LA <br />Fementla) <br />MULTIPLIER <br />ITEM <br />SCOPE O WORK <br />6751 <br />6711 <br />4100 <br />34.27 <br />39 W <br />2500 <br />261 <br />Marne einem <br />Project Management <br />Contract Compliance <br />4 <br />705 54 <br />Chant Communications <br />0 <br />4 <br />1839.% <br />General ManaOement <br />30 <br />529150 <br />Subcommitrnt Coordination <br />0 <br />Impcn98 Project Summates <br />2 <br />2 <br />40 <br />82826 <br />Labor Sabi <br />SUN, Visit <br />44.0 <br />0.0 <br />60 <br />0.0 <br />00 <br />40 <br />66649] <br />Tfavel_Ellensbur9/ Scale. RT Asaume 3 till, <br />fl0 <br />12.0 <br />40 <br />3954.69 <br />AJminameareLRTmuel Includes travel time neMeen bull <br />36.00 <br />10 <br />1 <br />360 <br />R.0 <br />moll 60 <br />Calculated- LR. field measures for culverts <br />6.00 <br />150 <br />90 <br />9.0 <br />176093 <br />Calculated - LR site treatment <br />600 <br />1.00 <br />60 <br />6.0 <br />1179% <br />IeWr Subbtal <br />00 <br />M.0 <br />99.0 <br />18.0 <br />00 <br />00 <br />2Po67.18 <br />LOAD RATING - 2017 <br />100 <br />ADMINISTRATIVE <br />deal <br />36 <br />400 <br />36.0 <br />1440 <br />2177535 <br />Corona. <br />0 <br />4.W <br />o.0 <br />00 <br />2.00 <br />UPDATE BRIDGES WITH SHV -CALCULATED <br />Concrete Slab hill Concrete Channel Carl <br />2 <br />100 <br />3200 <br />2.0 <br />15.0 <br />660 <br />797.22 <br />Concrete and Promitheread(78041) <br />1 <br />1.00 <br />4800 <br />1.0 <br />120 <br />49.0 <br />584020 <br />PraeVeaeed (86322,BR11, 16203) <br />2 <br />1.00 <br />3200 <br />2,0 <br />16.0 <br />660 <br />797622 <br />Conupatea'Arch Culverts(78021,79301]0141,78112,70001, <br />8 8 61) <br />6 <br />100 <br />Gl00 <br />60 <br />350 <br />150.0 <br />18340.37 <br />Steel Prr Girder (68161-Blf R) <br />1 <br />1.00 <br />4000 <br />t0 <br />100 <br />410 <br />4818% <br />Tlmber <br />0 <br />100 <br />32.00 <br />0.0 <br />00 <br />00 <br />J.W <br />Ll Subai <br />00 <br />480 <br />2A0 <br />3720 <br />00 <br />00 <br />Labor Lou.: <br />4400 <br />9200 <br />33900 <br />39100 <br />000 <br />400 <br />t <br />Management RealReimbursable <br />Sum: <br />