Laserfiche WebLink
bridges may be required to be posted with load restrictions <br />for emergency vehicles. <br />The Emergency vehicle load ratings are required to be <br />completed prior to December 31", 2019. It is anticipated <br />that Public Works will proactively seek to complete the <br />SHVs due in 2022 within the 2018 and 2019 budget cycle <br />in order to load rate all bridges for both SHVs and <br />emergency vehicles during one effort within the most <br />restrictive timeframe. <br />INTERACTION: Public Works <br />RECOMMENDATION: Move to approve the Chairman's Signature on Formal Task <br />Order Document Number 004 with KPFF Consulting <br />Engineers <br />HANDLING: Return one (1) copy to Public Works <br />ATTACHMENTS: Formal Task Order Document Number 004 <br />LEAD STAFF: Lucas Huck, County Engineer <br />