Laserfiche WebLink
WashingtonStateHorseParkConceptExtimateMaterialData27-Aug-06LapsleyMaterialCostinstalled$@PlantTrans.$CYTons$perTonTotal$PerTonPerTruckPerTruckPerTruckTonInstall$PerTon21/2"BallastRock$10.75$8.001521.6$11.12$2,00$13.125/8"CrushedRock$11.60$8.001521.6$11.97$2.00$13.97FootingMaterial70%Sand30%Clay$11.35$8.001521.6$11.72$2.00$13,72PorousAsphaltwithpolymeradditive$1.70perSFNikeAdditive$0.25PerSFRemovalofTopSoilUnitsAmountLoads/HrYds/hr$/hr$lCYE×cavator(Track-supportto10440$150.00$3.75DumpTruckYd10440$75.00$1.88Total$5.63ReplaceTopSoilExcavator(Track-supportto10440$150.00$3.75DumpTruckYd10440$75.00$1.88SpreadTopSoilYd10440$150.00$3.75Total$9.38RemoveandReplaceSoilRemovalofOrganicMaterialUnitsAmountLoads/HrYds/hr$/TonExcavator(Track-supporttoYd10330DumpTruckYd10330DisposalTon21363$37.50TotalConcrete5DeliveredTrans.$Yds/TruckMaterial$Total$$/ydPerCYPerTruckDeliveredConcrete5sack$77.50$8.0011852.5$860.50$78.23