Laserfiche WebLink
WashingtonStateHorseParkEntryRoadAug-06ItemUnitsLengthWidthAmt$/UnitUnit$GSFCost/sfCost5/8"CrushedRockTons3,000261,040$13.97$14,52978,000$14,529CompactionSF3,0002678,000$0.056$4,329PavingSF3,0002472,000$2.00$144,000CurbsLF6,00016,000$12.00$72,000SignsEA1$1,200.00$1,2000$1,200FencingIf6,000$12.00$72,000572,000$308,058ContractorsOverhead12.0%$36,967ContractorsProfit10.0%30,806ContractorsBid$375,831DesignContingency20.0%$75,166Contingency0.0%SOConstructionEstimate$450,997Roundup$451,000MaterialTakeoffLengthWidthThickmCUFTCYKFactorTonsFinalGrading/3/4-3,00026319,5007221.441,040