|
WashingtonStateHorseParkConceptEstimateCoveredArenaApr-04LapsleyPage1of2ItemAmtUnitUnitPriceTotalUnitTotalRaterotalLaboLineCostHrHrCostFieldSurvey(CornersElv)1.00jbSO48$156.00$1,248$1,248Excavation10,000cy$5.63$56,250050$56,250FoundationForms4,000If$3.78$15,1200.24960527.00$25,920$41,040FoundationRebar9.00Tons$500.00$4,50016144$27.00$3,888$8,388FoundationConcrete1,300cy$78.23$101,69500$27.00$0$101,695FoundationConcreteFinish1,300cy$78.23$101,6950.25325$27.00$8,775$110,470FlatVVorkForms600If$2.60$1,5600.0954$O$1,560FlatWorkRebar7.00Tons$500.00$3,50016112$27.00$3,024$6,524FlatWorkConcrete150sf$0.75$1130$05113FlatWorkConcreteFinish1,500sf$0.75$1,1250050.00$0$1,125BackFitiClassified9,000cy$5.63$50,6250.00327$27.00$729$51,354BackFillBaseRock1,300cy$13.12$17,0560.0033.9$27.00$105$17,162BackFill5/8"1,300cy$5.63$7,3130.0339527.00$1,053$8,366Structure64,000sf.$7.25$464,0000.148960$27.00$241,920$705,920Crane(20T,60'Boom)1Wk$8,000.00$8,0004040$35.00$1,40059,400Sand900Tons$13.72$12,3480.0545$27.00$1,215$13,563ShreddedRubbermix60,000sf50.25$15,0000.000318$27.00$486$15,486HighBayLighting160ea-$150.00$24,0001160$37.50$6,000$30,000ElectricalRoughIn64,000sf50.80$51,200050551,200FireAlarmSystem64,000sf$0.15$9,6000SO59,600FireSuppressionSystem'4,000sf$3.00$12,000050512,000PlumbingRoughIn60ea$120.00$7,2003180$37.50$6,750$13,950Lavatories16ea$200.00$3,2002.540$37.50$1,500$4,700Urinals6ea$225.00$1,3502.515$37.50$563$1,913Sinks16ea$110.00$1,7602.540$37.50$1,500$3,260WashingtonStateHorseParkConceptEstimateCoveredArenaAug-06
|