My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Towns to Teanaway Corridor Acquistion-Roslyn
>
Meetings
>
2017
>
06. June
>
2017-06-20 10:00 AM - Commissioners' Agenda
>
Towns to Teanaway Corridor Acquistion-Roslyn
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2018 3:25:37 PM
Creation date
1/16/2018 12:02:35 PM
Metadata
Fields
Template:
Meeting
Date
6/20/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Lodging Tax Large Scale Projects Presentations and Request to Consider the Lodging Tax Advisory Committee's Recommendation on the Tourism-Related, Large-Scale Municipality-Owned Capital Projects and Operations Grant Applications
Order
1
Placement
Board Discussion and Decision
Row ID
37453
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Real Property or "Right-of-Way"Acquisition Cost <br />•$2,733,500 <br />Capital Asset Cost <br />•$2,733,500 <br />Construction Cost or "Hard"Cost <br />•$145,100 <br />Include an itemized list of general costs <br />For example:asset type and cost,site prep,building foundation and structure, <br />mechanical work,finish work,site restoration,electrical work,technology,etc. <br />•See attached budget <br />Soft Cost <br />Include an itemized list of soft costs <br />For example:feasibility analysis,design fees,construction managementfees, <br />survey costs,engineering fees,permitting costs,special inspections,cultural resource <br />surveys,etc. <br />•$75,000 <br />Total Project Costs <br />This project budget,being submitted as part of this application,will be considered an <br />estimate.As the project progresses through the four-step process,applicants will be <br />required to update the project budget as more information becomes availableand at the <br />time of funding award. <br />•$2,953,600 <br />*At the time funding awards are being considered (Steps 3 and 4),verifying <br />documentationshall be required and attached to the final project budget.Verifying <br />documentationmay include award letters,letters of commitment,or loan approval <br />documentation.If the funding source includes applicant funds,proof of availablefunding <br />in the form of a letter of commitmentfrom an authorized body or representativeof the <br />applicant is adequate.
The URL can be used to link to this page
Your browser does not support the video tag.