Laserfiche WebLink
Real Property or "Right-of-Way"Acquisition Cost <br />•$2,733,500 <br />Capital Asset Cost <br />•$2,733,500 <br />Construction Cost or "Hard"Cost <br />•$145,100 <br />Include an itemized list of general costs <br />For example:asset type and cost,site prep,building foundation and structure, <br />mechanical work,finish work,site restoration,electrical work,technology,etc. <br />•See attached budget <br />Soft Cost <br />Include an itemized list of soft costs <br />For example:feasibility analysis,design fees,construction managementfees, <br />survey costs,engineering fees,permitting costs,special inspections,cultural resource <br />surveys,etc. <br />•$75,000 <br />Total Project Costs <br />This project budget,being submitted as part of this application,will be considered an <br />estimate.As the project progresses through the four-step process,applicants will be <br />required to update the project budget as more information becomes availableand at the <br />time of funding award. <br />•$2,953,600 <br />*At the time funding awards are being considered (Steps 3 and 4),verifying <br />documentationshall be required and attached to the final project budget.Verifying <br />documentationmay include award letters,letters of commitment,or loan approval <br />documentation.If the funding source includes applicant funds,proof of availablefunding <br />in the form of a letter of commitmentfrom an authorized body or representativeof the <br />applicant is adequate.