Laserfiche WebLink
Enhance aesthetics and 4%10%40%33%12%upgrade ventilation and <br />appearance heat;insert natural sky-lighting;Buffer adjacent neighborhoods 11%21%34%23%11%and utilize new flexible bleacher <br />systems. <br />Improvement projects 25:Exhibition Hall -when market 6%9%30%36%19% <br />feasibility indicates,develop an <br />Survey respondents were asked to rate all of the proposed 47 exhibition hall to provide indoor <br />master plan projects on a scale from lowest to highest priority.vendors,trade shows,large <br />Following are the results ordered by the highest percentage meetings and presentations, <br />accorded to the highest priority for all 47 projects.entertainment events,and a <br />variety of other activities to <br />Project priorities lwst low ave high hist expand revenue uses year-round. <br />40:Mobile Home Park -acquire 13%14%19%25%29%11:Kid Fair -during Fair,erect a 8%12%29%32%18% <br />the mobile home park to resolve temporary space to provide a <br />code and safety issues;petting zoo,toy farm equipment, <br />facilitate better low cost housing and other interpretive and <br />options for occupants;and interactive displays for children. <br />restore and adequately buffer 3:Livestock barn retrofitting -5%8%32%38%17% <br />Wilson Creek.reframe the existing historical <br />19:Historic west grandstand -8%8%25%37%23%barns;remove wooden stalls; <br />replace wooden seats;install seat install changeable metal stalls for <br />backs;and reconstruct the hogs,cattle,and horses; <br />walkway over the arena to configure a direct aisle through <br />improve safety and amenities.all of the barns into Bloom <br />18:North grandstands -6%9%30%34%21%Pavilion;and add wash racks. <br />reconstruct the northwest and 34:Permanent parking lot -9%10%29%35%17% <br />northeast grandstands to improve improve the parking lot between <br />safety and meet building codes;Maple and Alder with pavement, <br />increase seating capacity;provide trees,landscaping,drainage,and <br />box seats;and incorporate upper walkways from University Way to <br />story concessions and restrooms.the Fair and Rodeo ticket gates. <br />42:Wilson Creek restoration -12%16%27%25%20%32:Wilson Creek -plant native 11%15%34%23%17% <br />replant native vegetation and vegetation and trees in the buffer <br />trees to restore a buffer area area along Wilson Creek from <br />along Wilson Creek from John Wayne Trail to where the <br />University Way to John Wayne creek goes underground at the <br />Trail.east end of the rodeo arena. <br />1:Bloom Pavilion renovation -4%6%32%39%19%2:Bloom Pavilion Lean-to -6%8%32%38%16% <br />install seismic reinforcements;demolish Colockum Barn (an <br />38