My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kittitas Valley Event Center Barns & Bloom Pavilion Project-Kitt Co
>
Meetings
>
2017
>
06. June
>
2017-06-20 10:00 AM - Commissioners' Agenda
>
Kittitas Valley Event Center Barns & Bloom Pavilion Project-Kitt Co
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2018 2:58:27 PM
Creation date
1/16/2018 12:01:02 PM
Metadata
Fields
Template:
Meeting
Date
6/20/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Lodging Tax Large Scale Projects Presentations and Request to Consider the Lodging Tax Advisory Committee's Recommendation on the Tourism-Related, Large-Scale Municipality-Owned Capital Projects and Operations Grant Applications
Order
1
Placement
Board Discussion and Decision
Row ID
37453
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
I <br />Master plan elements <br />The following describe the principal improvement actions in the 2:Bloom Pavilion Lean-to -demolish Colockum Barn (an <br />Kittitas Valley Event Center master plan.The actions are organized undersized and inefficient structure)and build an extension of the <br />by function and indexed in the segmented plan graphics.Pavilion to increase capacity;provide flexible stalling for hogs, <br />cattle,and horses;with direct access into the Pavilion.Livestock barns <br />3:Livestock barn retrofitting -reframe the existing historical <br />The master plan includes a number of actions to enhance the barns;remove wooden stalls;install changeable metal stalls for <br />functional operations and capacity of the fairground livestock hogs,cattle,and horses;configure a direct aisle through all of the <br />barns.barns into Bloom Pavilion;and add wash racks. <br />Livestock Barns -proposed improvements 4:Dog Barn demolition -demolish the small and inefficient poultry <br />and dog barn at the east end of the line of barns to provide a safe <br />vehicle turning radius and visibility for livestock loading and <br />unloading access. <br />.5:Maintenance facility -build a new,efficient,and functional <br />ange mamtenance facility at the end of Poplar Street in place of the <br />-underused warm-up lot. <br />egen.6:4-H changing rooms -retrofit the existing maintenance yard <br />building to provide restrooms,showers,changing facilities,lockers, <br />.and lounge for 4-H participants. <br />7:Stalling Barn 1 -construct a new flexible stalling barn outfitted <br />with changeable metal stalls,internal arena,and wash rack in place <br />lan *..' <br />'of the existing maintenance yard south of Bloom Pavilion. <br />8:Stalling Barn 2 -demolish the existing ticket gate,counter,and <br />administration building and build a new flexible stalling barn <br />outfitted with changeable metal stalls,internal arena,and wash <br />rack;and new adjacent public restrooms. <br />9:Stalling Barn 3 -if and when the property becomes available, <br />construct a new flexible stalling barn outfitted with changeable <br />1:Bloom Pavilion renovation -install seismic reinforcements;metal stalls,internal arena,and wash rack in place of the residentialupgradeventilationandheat;insert natural sky-lighting;and utilize structures west of Bloom Pavilion. <br />new flexible bleacher systems. <br />30
The URL can be used to link to this page
Your browser does not support the video tag.