Laserfiche WebLink
Kittitas Valley Event Center Barns and Bloom Pavilion Project Budget <br />Funding Sources <br />Lodging Tax Funds Request $872,950.00 <br />Other Grant Funds <br />State Capital Budget Appropriation Request $750,000.00 <br />Other Local Government Funds <br />County-funded contribution $122,950.00 <br />Total Available Funding $1,745,900.00 <br />Project Expenses <br />Construction Allowance $1,500,000.00 <br />Includes: <br />Demolition of Clockum Barn and Wash Racks <br />Survey and historic evaluation included <br />Construction of structure on east side of Bloom Pavilion <br />10,000 square feet with metal roof and 1 hour fire wall <br />Concrete floor with trench drain <br />Provide large opening in east wall for access to Pavilion <br />Provide general lighting <br />Sky lights included <br />Replace interior footing <br />Improvements to Bloom Pavilion <br />Add heating <br />Improve ventilation <br />Cut large opening in east wall for access to barns to the east <br />Replace roofing <br />Reseal panel joints <br />Provide new exit door at west wall <br />Add fire hydrant as requested by KVFR <br />Two new wash racks <br />Provide concrete slab with trench drain <br />Provide ten hose bibs <br />Locate one wash rack on the east side of the new structure and one <br />'on the east side of the Draft Horse barn <br />Soft Costs <br />Design,construction documents,bidding <br />&constructionadministration $147,000.00 <br />Survey $4,400.00 <br />Historic Evaluation of Clockum Barn $3,000.00 <br />Other contract costs for architect $11,500.00 <br />Permitting $30,000.00 <br />Project management $50,000.00 <br />Total Project Costs $1,745,900.00