My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kittitas Valley Event Center Barns & Bloom Pavilion Project-Kitt Co
>
Meetings
>
2017
>
06. June
>
2017-06-20 10:00 AM - Commissioners' Agenda
>
Kittitas Valley Event Center Barns & Bloom Pavilion Project-Kitt Co
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2018 2:58:27 PM
Creation date
1/16/2018 12:01:02 PM
Metadata
Fields
Template:
Meeting
Date
6/20/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Lodging Tax Large Scale Projects Presentations and Request to Consider the Lodging Tax Advisory Committee's Recommendation on the Tourism-Related, Large-Scale Municipality-Owned Capital Projects and Operations Grant Applications
Order
1
Placement
Board Discussion and Decision
Row ID
37453
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Kittitas Valley Event Center Barns and Bloom Pavilion Project Budget <br />Funding Sources <br />Lodging Tax Funds Request $872,950.00 <br />Other Grant Funds <br />State Capital Budget Appropriation Request $750,000.00 <br />Other Local Government Funds <br />County-funded contribution $122,950.00 <br />Total Available Funding $1,745,900.00 <br />Project Expenses <br />Construction Allowance $1,500,000.00 <br />Includes: <br />Demolition of Clockum Barn and Wash Racks <br />Survey and historic evaluation included <br />Construction of structure on east side of Bloom Pavilion <br />10,000 square feet with metal roof and 1 hour fire wall <br />Concrete floor with trench drain <br />Provide large opening in east wall for access to Pavilion <br />Provide general lighting <br />Sky lights included <br />Replace interior footing <br />Improvements to Bloom Pavilion <br />Add heating <br />Improve ventilation <br />Cut large opening in east wall for access to barns to the east <br />Replace roofing <br />Reseal panel joints <br />Provide new exit door at west wall <br />Add fire hydrant as requested by KVFR <br />Two new wash racks <br />Provide concrete slab with trench drain <br />Provide ten hose bibs <br />Locate one wash rack on the east side of the new structure and one <br />'on the east side of the Draft Horse barn <br />Soft Costs <br />Design,construction documents,bidding <br />&constructionadministration $147,000.00 <br />Survey $4,400.00 <br />Historic Evaluation of Clockum Barn $3,000.00 <br />Other contract costs for architect $11,500.00 <br />Permitting $30,000.00 <br />Project management $50,000.00 <br />Total Project Costs $1,745,900.00
The URL can be used to link to this page
Your browser does not support the video tag.