Laserfiche WebLink
EIIensburg,Washington Wayfinding Master Plan <br />5.Implementation <br />Ideally,the signs in the program would be implemented in one budget cycle.However,many communities opt to phase in signs over <br />time.In the case of Ellensburg,the following phasing approach should be used if needed: <br />•Priority One:Vehicular trailblazing system.If phasing needs to be broken down further,Ellensburg should concentrate on <br />one corridor at a time with Trailblazing signs. <br />.Priority Two:Gateways which can be implemented in phases. <br />•Priority Three:Pedestrian Oriented Signs which can be implemented as downtown continues to expand. <br />Wayfinding System Cost Estimates <br />Total UnitCountTypeUnitCostTotalUnitCostUnitInstallationCost Total CostInstallationCost <br />32 Vehicular Directional $1,200.00 $38,400.00 $400.00 $12,800.00 $51,200.00 <br />5 Gateways $5,000.00 $25,000.00 $400.00 $2,000.00 $27,000.00 <br />Estimated 4 Pedestrian Map $800.00 $3,200.00 $400.00 $1,600.00 $4,800.00 <br />Estimated 4 Parking Directionaf $400.00 $1,600.00 $200.00 $800.00 $2,400.00 <br />Estimated 4 Pedestrian Directional $1,200.00 $4,800.00 $400.00 $1,600.00 $6,400.00 <br />$73,000.00 $18,800.00 $91,800.00 Low Estimate Total <br />Total UnitCountTypeUnitCostTotalUnitCostUnitInstallationCost Total CostInstallationCost <br />32 Vehicular Directional $2,200.00 $70,400.00 $600.00 $19,200.00 $89,600.00 <br />5 District Gateways $10,000.00 $50,000.00 $600.00 $3,000.00 $53,000.00 <br />Estimated 4 Pedestrian Map $1,200.00 $4,800.00 $600.00 $2,400.00 $7,200.00 <br />Est\mated 4 Parking Directional $1,200.00 $4,800.00 $600.00 $2,400.00 $7,200.00 <br />Estimated 4 Pedestrian Directional $2.200.00 $8,800.00 $600.00 $2.400.00 $11.200.00 <br />$138,800.00 $29,400.00 $168,200.00 High Estimate Total <br />35